{"id":"1135eddf-79b2-4cde-aa07-753c2624341f","slug":"xai-colossus-2-southaven-mississippi","name":"xAI Colossus 2 Data Center","aliases":[],"locationId":"f4cdf31d-c4d5-44eb-8a8e-f49031f29564","lat":null,"lng":null,"landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"xAI's second Colossus supercomputer campus in Southaven, Mississippi, part of an expansion of the Memphis-area Colossus complex toward roughly 2 GW. As of 2026 it was powered largely by on-site natural gas turbines, with 46 turbines (about 495 MW) reported operating without air permits and 41 additional turbines permitted in March 2026.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/xai-deploys-19-natural-gas-turbines-at-colossus-2-data-center-in-southaven-mississippi-report/","title":"DCD: xAI deploys gas turbines at Colossus 2, Southaven"},{"url":"https://en.wikipedia.org/wiki/Colossus_(data_center)","title":"Wikipedia: Colossus (data center)"},{"url":"https://www.gem.wiki/Colossus_2_power_station","title":"Global Energy Monitor: Colossus 2 power station"},{"url":"https://www.selc.org/news/xai-built-an-illegal-power-plant-to-power-its-data-center/","title":"SELC: xAI gas turbines and air permits"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:40.420Z","updatedAt":"2026-08-19T00:47:40.812Z","location":{"id":"f4cdf31d-c4d5-44eb-8a8e-f49031f29564","name":"Southaven","slug":"southaven-mississippi","kind":"city","parentLocationId":"9a077787-7f1b-40d2-a9cc-7d45fd07c68f","region":null,"lat":34.9873822,"lng":-90.0034862,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:47:39.977Z","updatedAt":"2026-08-19T01:24:23.194Z"},"parties":[{"id":"fa3e9274-696b-449c-bcd9-ee1337eb451c","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","companyId":"d7bc30aa-e892-42f7-a58a-e172534fec48","externalName":null,"role":"developer","structureNotes":"Owner and operator of Colossus supercomputer campuses","createdAt":"2026-08-19T00:47:44.063Z","company":{"id":"d7bc30aa-e892-42f7-a58a-e172534fec48","name":"xAI","slug":"xai"}},{"id":"ff9f7099-7a22-4035-9695-0bfca1132f3d","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","companyId":"d7bc30aa-e892-42f7-a58a-e172534fec48","externalName":null,"role":"operator","structureNotes":null,"createdAt":"2026-08-19T00:47:45.287Z","company":{"id":"d7bc30aa-e892-42f7-a58a-e172534fec48","name":"xAI","slug":"xai"}}],"capacityClaims":[{"id":"eaa01ac6-1ce8-41dd-854e-cde01ec120c3","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","series":"announced","valueGw":1.2,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://en.wikipedia.org/wiki/Colossus_(data_center)","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Colossus 2 targeted at roughly 1.2 GW; combined Memphis-area complex targeted near 2 GW","createdAt":"2026-08-19T00:47:41.557Z"}],"financialClaims":[{"id":"b319aef3-6f1b-4103-ad00-24953c599f13","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","kind":"capex","label":"Reported multi-billion investment (largest private-sector in state history)","valueUsd":null,"capUsd":null,"conditions":"Aggregate figures vary across reports","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://en.wikipedia.org/wiki/Colossus_(data_center)","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:47:42.118Z"}],"metricClaims":[{"id":"809a3544-e01a-411a-b9ab-fb1ea053dd95","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","metricType":"gpu_count","valueNumeric":null,"valueText":"Targeting on the order of 1 million Nvidia Blackwell GPUs; several hundred thousand deployed by mid-2026","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://en.wikipedia.org/wiki/Colossus_(data_center)","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:47:43.288Z"}],"powerProjects":[{"id":"9644e95a-f6cc-4853-b112-81bfb7e36ab5","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","name":"Colossus 2 on-site gas turbine fleet","type":"gas","capacityGw":0.495,"lifecycleState":"partially_energized","sourceUrl":"https://www.gem.wiki/Colossus_2_power_station","evidenceTier":"reported","note":"~46 turbines (~495 MW) reported operating; 41 additional turbines permitted March 2026","createdAt":"2026-08-19T00:47:42.904Z"}],"facilities":[],"incidents":[],"events":[{"id":"38bc3e88-cf83-4c38-80c1-2642da1761c3","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: d7bc30aa-e892-42f7-a58a-e172534fec48","occurredAt":"2026-08-19T00:47:45.743Z","createdAt":"2026-08-19T00:47:45.743Z"},{"id":"ecd068bf-4254-4a8c-bb7e-982f83af97f2","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: d7bc30aa-e892-42f7-a58a-e172534fec48","occurredAt":"2026-08-19T00:47:44.516Z","createdAt":"2026-08-19T00:47:44.516Z"},{"id":"610e71a3-db04-4fa2-a7a1-c67992c4f716","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Reported multi-billion investment (largest private-sector in state history)","occurredAt":"2026-08-19T00:47:42.525Z","createdAt":"2026-08-19T00:47:42.525Z"},{"id":"37d9f87e-0e1b-4b64-8dfd-edb165018433","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.2","claimId":"eaa01ac6-1ce8-41dd-854e-cde01ec120c3","detail":null,"occurredAt":"2026-08-19T00:47:41.871Z","createdAt":"2026-08-19T00:47:41.871Z"},{"id":"00422548-8fce-4d45-a07f-3abc8e64084e","dataCenterId":"1135eddf-79b2-4cde-aa07-753c2624341f","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.2","claimId":"eaa01ac6-1ce8-41dd-854e-cde01ec120c3","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:47:41.716Z","createdAt":"2026-08-19T00:47:41.716Z"}],"capacity_picture":{"announced_gw":1.2,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1.2,"by_series":{"announced":{"valueGw":1.2,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://en.wikipedia.org/wiki/Colossus_(data_center)"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"xAI Colossus 2 Data Center","url":"https://registry.deploy.report/datacenters/xai-colossus-2-southaven-mississippi","address":{"@type":"PostalAddress","addressLocality":"Southaven"}}}