{"id":"6c37130e-35d9-4987-8196-9ab3f0882584","slug":"ytl-green-data-center-park-kulai-johor","name":"YTL Green Data Center Park","aliases":[],"locationId":"ce12f299-2d7b-4120-88e3-c2a76f169ab3","lat":1.61593,"lng":103.51808,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"Tenaga Nasional Berhad (TNB)","waterSourceNotes":null,"servingUtility":null,"acreage":1640,"totalBuildingSqft":null,"streetAddress":null,"notes":"1,640-acre hyperscale park in Kulai, Johor developed by YTL Power International / YTL Data Center Holdings, planned for up to 500MW and pitched as Malaysia's first hyperscale park co-powered by on-site solar (500MW solar plant plus ~600MW grid backup). YTL completed and energized its first Nvidia-powered facility (YTL AI Cloud, liquid-cooled GB200 NVL72 GPUs) on 31 Oct 2025; ~300MW is currently being built/commissioned toward full capacity within about two years. Part of a RM10bn (~$2.1bn) YTL-Nvidia project within a broader ~$4.3bn Malaysia buildout.","keyFacts":[{"label":"First NVIDIA AI facility online (company / press)","value":"Oct 31 2025 The Edge reported YTL Power announced completion of its first NVIDIA-powered AI data centre at the YTL Green Data Center Park in Kulai, Johor, with YTL AI Cloud now operational on liquid-cooled NVL72 Grace Blackwell (GB200) GPUs ([The Edge Malaysia, Oct 31 2025](https://theedgemalaysia.com/node/776142))","sourceUrl":"https://theedgemalaysia.com/node/776142"},{"label":"Campus acreage / solar (press)","value":"The Edge cites a 1,640-acre campus in Johor running on renewable energy from a 500 MW solar plant, and frames the park at 600 MW in the company update to Malaysian officials ([The Edge Malaysia, Oct 31 2025](https://theedgemalaysia.com/node/776142))","sourceUrl":"https://theedgemalaysia.com/node/776142"},{"label":"JDC2 IT load / offtake (press)","value":"Nov 4 2025 The Star reported the completed AI facility is a 20 MW JDC2 site fitted with NVIDIA GB200 NVL72 GPUs, with part of capacity contracted by an undisclosed US offtaker and the rest used by YTL for its LLM and AI solutions ([The Star, Nov 4 2025](https://www.thestar.com.my/business/business-news/2025/11/04/ytl-powers-dc-business-to-boost-earnings-growth))","sourceUrl":"https://www.thestar.com.my/business/business-news/2025/11/04/ytl-powers-dc-business-to-boost-earnings-growth"},{"label":"Buildout phases (press)","value":"The Star describes the wider park as a proposed ~500 MW Green Data Centre Park with about 300 MW being built and commissioned, JDC3 at 80 MW (half targeted by Sep 2025, rest 2026), and JDC4 at 40 MW IT load for a US hyperscaler in three phases through 2027 ([The Star, Nov 4 2025](https://www.thestar.com.my/business/business-news/2025/11/04/ytl-powers-dc-business-to-boost-earnings-growth))","sourceUrl":"https://www.thestar.com.my/business/business-news/2025/11/04/ytl-powers-dc-business-to-boost-earnings-growth"},{"label":"Sovereign AI / ILMU (press)","value":"TechNode Global quotes YTL Power MD Yeoh Seok Hong saying the operational YTL AI Cloud plus ILMU (Malaysian-developed LLM) advance Malaysia sovereign AI, with NVIDIA partnership framed as a major step ([TechNode Global, Nov 3 2025](https://technode.global/2025/11/03/ytl-power-completes-nvidia-powered-ai-data-center-facility-in-johor/))","sourceUrl":"https://technode.global/2025/11/03/ytl-power-completes-nvidia-powered-ai-data-center-facility-in-johor/"}],"reviewStatus":"reviewed","sources":[{"url":"https://theedgemalaysia.com/node/776142","title":"YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational","sourceName":"The Edge Malaysia"},{"url":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","title":"YTL Power completes Nvidia-powered AI data centre in Johor","sourceName":"W.Media"},{"url":"https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/","title":"Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia","sourceName":"Data Center Dynamics"},{"url":"https://www.thestar.com.my/business/business-news/2026/06/29/ytl-power-stamping-its-mark-on-dc-sector","title":"YTL Power stamping its mark on DC sector","sourceName":"The Star"},{"url":"https://www.thestar.com.my/business/business-news/2025/11/04/ytl-powers-dc-business-to-boost-earnings-growth","date":"2025-11-04","title":"YTL Power's DC business to boost earnings growth","publisher":"The Star"},{"url":"https://technode.global/2025/11/03/ytl-power-completes-nvidia-powered-ai-data-center-facility-in-johor/","date":"2025-11-03","title":"YTL Power completes NVIDIA-powered AI data center facility in Johor","publisher":"TechNode Global"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:12.630Z","updatedAt":"2026-09-28T09:26:02.860Z","location":{"id":"ce12f299-2d7b-4120-88e3-c2a76f169ab3","name":"Kulai","slug":"kulai-johor","kind":"city","parentLocationId":"cfe7e5c8-29d4-4bd5-ad0f-bb9d05caddc6","region":null,"lat":1.6615,"lng":103.6059,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:12.254Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"eea42d68-828a-4d5b-81d4-dd2ca97eb92d","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":null,"externalName":"YTL Power International / YTL Data Center Holdings","role":"developer","structureNotes":"Owner-operator of the 1,640-acre park; runs YTL AI Cloud.","createdAt":"2026-08-17T18:12:15.801Z","company":null},{"id":"d35f3726-feb9-4016-9348-2d92cc61b5ad","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"423f5b3a-7d70-46bc-afe2-12d3b392d699","externalName":"YTL AI Cloud","role":"tenant","structureNotes":"Sovereign/government and citizen AI services host on the first energized facility.","createdAt":"2026-08-17T18:12:17.334Z","company":{"id":"423f5b3a-7d70-46bc-afe2-12d3b392d699","name":"YTL AI Cloud","slug":"ytl-ai"}},{"id":"b7710a32-fc88-440c-8db1-7fef53a24c42","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":"Nvidia","role":"chip_supplier","structureNotes":"Liquid-cooled GB200 NVL72 Grace Blackwell GPUs; strategic partner in the RM10bn project.","createdAt":"2026-08-17T18:12:16.564Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"234034a7-4fab-419e-85f3-ba3eab3f30a1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":null,"externalName":"Sea Limited","role":"tenant","structureNotes":"Anchor tenant of the first phase (Sea Data Center), RM1.5 billion groundbreaking.","createdAt":"2026-08-19T01:33:39.560Z","company":null},{"id":"dcabe0cb-5ab5-4884-b8e8-13ff26757466","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"423f5b3a-7d70-46bc-afe2-12d3b392d699","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-27T22:22:43.797Z","company":{"id":"423f5b3a-7d70-46bc-afe2-12d3b392d699","name":"YTL AI Cloud","slug":"ytl-ai"}}],"capacityClaims":[{"id":"132ac123-bed9-48cb-b7e4-0ca95f94d120","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"announced","valueGw":0.5,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Park planned for up to 500MW total capacity.","createdAt":"2026-08-17T18:12:13.316Z"},{"id":"d65785c4-818f-411b-b4e1-935b79eff34a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"energized","valueGw":0.048,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"verified","supersedesId":null,"note":"YTL Power completed its first Nvidia GB200-powered facility (JDC1) Oct 31 2025, YTL AI Cloud live; first-phase IT load 48MW (expandable to 72MW), 32MW anchor tenant. Energized operational phase within the 600MW park plan; operational as of Aug 2026.","createdAt":"2026-08-17T18:33:49.118Z"},{"id":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"under_construction","valueGw":0.3,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"~300MW being built and commissioned; full capacity expected within ~2 years.","createdAt":"2026-08-17T18:12:14.161Z"}],"financialClaims":[{"id":"e95c2df6-89f8-475b-8b08-e2ff892464f1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"YTL Power - Nvidia AI data center project","valueUsd":"2100000000","capUsd":null,"conditions":"RM10bn YTL Power / Nvidia project at Kulai; part of a broader ~$4.3bn Malaysia buildout reported by DCD.","asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:12:14.771Z"},{"id":"957bd789-ecda-4a1d-83e5-b3e6e1c7114b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"Total project (YTL Power / Nvidia)","valueUsd":null,"capUsd":null,"conditions":"RM10 billion total project value; USD not disclosed","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:33:36.395Z"},{"id":"6803478d-1f60-4a53-bcea-f49a83b8152b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"First-phase Sea Data Center investment","valueUsd":null,"capUsd":null,"conditions":"RM1.5 billion first phase (up to 72 MW), anchored by Sea Ltd; USD not disclosed","asOf":"2023-06-01T00:00:00.000Z","sourceUrl":"https://www.mida.gov.my/media-release/ytl-data-centers-and-sea-break-ground-with-the-rm1-5bil-first-phase-of-the-500mw-ytl-green-data-center-park-in-johor/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T01:33:37.160Z"}],"metricClaims":[{"id":"10dd78f3-bee5-421b-a730-7bca7b008ecd","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","metricType":"cooling_type","valueNumeric":null,"valueText":"Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:38.798Z"}],"powerProjects":[{"id":"677d2252-f516-4948-87d8-7de222faf948","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","name":"On-site solar plant","type":"solar","capacityGw":0.5,"lifecycleState":"under_construction","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","evidenceTier":"reported","note":"500 MW solar plant co-powering Malaysia's first renewable-powered hyperscale data center park.","createdAt":"2026-08-19T01:33:37.920Z"},{"id":"a2cf106f-d902-4020-8438-6e9dd191e0f7","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","name":"National grid backup supply","type":"grid","capacityGw":0.6,"lifecycleState":"announced","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","evidenceTier":"reported","note":"600 MW backup supply from the national grid (TNB).","createdAt":"2026-08-19T01:33:38.301Z"}],"facilities":[],"incidents":[],"events":[{"id":"c8bbbf82-e804-4961-a675-fdef1ddc3ead","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: linked externalName \"YTL AI Cloud\" to company ytl-ai","occurredAt":"2026-08-31T01:15:08.268Z","createdAt":"2026-08-31T01:15:08.268Z"},{"id":"1df15e0c-6ee6-4382-9ffb-46b83b231bc1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Sea Limited","occurredAt":"2026-08-19T01:33:39.947Z","createdAt":"2026-08-19T01:33:39.947Z"},{"id":"d86f2bd6-9d0d-4696-98e9-2415b8d6151a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: First-phase Sea Data Center investment","occurredAt":"2026-08-19T01:33:37.541Z","createdAt":"2026-08-19T01:33:37.541Z"},{"id":"2b475c1b-5601-4416-8638-2e079c7fd20d","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total project (YTL Power / Nvidia)","occurredAt":"2026-08-19T01:33:36.780Z","createdAt":"2026-08-19T01:33:36.780Z"},{"id":"7386c6e4-e5b9-4d87-9bdb-fbae92bf1774","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.048","claimId":"d65785c4-818f-411b-b4e1-935b79eff34a","detail":null,"occurredAt":"2026-08-17T18:33:49.418Z","createdAt":"2026-08-17T18:33:49.418Z"},{"id":"88e65bb3-8be4-41dc-a07d-15aaa82caedf","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.048","claimId":"d65785c4-818f-411b-b4e1-935b79eff34a","detail":"verified · journalist_report","occurredAt":"2026-08-17T18:33:49.269Z","createdAt":"2026-08-17T18:33:49.269Z"},{"id":"a9b6aac3-25e2-41dc-85e8-2332b74c74fd","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: YTL AI Cloud","occurredAt":"2026-08-17T18:12:17.712Z","createdAt":"2026-08-17T18:12:17.712Z"},{"id":"ea47ab7c-0304-4565-8590-9507ec67ed3b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: Nvidia","occurredAt":"2026-08-17T18:12:16.946Z","createdAt":"2026-08-17T18:12:16.946Z"},{"id":"07bab3ce-5101-4adf-b3b9-32257daf7a9a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: YTL Power International / YTL Data Center Holdings","occurredAt":"2026-08-17T18:12:16.186Z","createdAt":"2026-08-17T18:12:16.186Z"},{"id":"9341dfcc-4aed-4f48-84ae-46d968f5a371","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: YTL Power - Nvidia AI data center project","occurredAt":"2026-08-17T18:12:15.415Z","createdAt":"2026-08-17T18:12:15.415Z"},{"id":"2fca6c8b-277d-4a4d-8157-945eb9a3a918","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","detail":null,"occurredAt":"2026-08-17T18:12:14.542Z","createdAt":"2026-08-17T18:12:14.542Z"},{"id":"4891ac07-cabd-40c0-a634-bc212b8811fb","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:14.316Z","createdAt":"2026-08-17T18:12:14.316Z"},{"id":"ba29ebcf-448e-4def-8877-74d6712dbc58","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.5","claimId":"132ac123-bed9-48cb-b7e4-0ca95f94d120","detail":null,"occurredAt":"2026-08-17T18:12:13.616Z","createdAt":"2026-08-17T18:12:13.616Z"},{"id":"4c6f8ba6-198b-4cdc-ac93-40273d1d5121","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"132ac123-bed9-48cb-b7e4-0ca95f94d120","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:13.464Z","createdAt":"2026-08-17T18:12:13.464Z"}],"capacity_picture":{"announced_gw":0.5,"contracted_gw":null,"under_construction_gw":0.3,"energized_gw":0.048,"announced_minus_energized_gw":0.452,"by_series":{"announced":{"valueGw":0.5,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/"},"contracted":null,"under_construction":{"valueGw":0.3,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/"},"energized":{"valueGw":0.048,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://theedgemalaysia.com/node/776142"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"YTL Green Data Center Park","url":"https://registry.deploy.report/datacenters/ytl-green-data-center-park-kulai-johor","geo":{"@type":"GeoCoordinates","latitude":1.61593,"longitude":103.51808},"address":{"@type":"PostalAddress","addressLocality":"Kulai"}}}