{"id":"04fa129b-6e90-47ed-93dc-4613029ffec0","slug":"bitdeer-massillon-fire-2025-11","kind":"property_damage","headline":"Fire damages two buildings at Bitdeer Massillon, Ohio data center construction site","summary":"On November 11, 2025, a fire broke out at Bitdeer's under-construction data center in Massillon, Ohio, damaging two of the 26 buildings in the complex. No personal injuries were reported. The Massillon Fire Department found no signs of arson. Bitdeer reported that reconstruction of the two fire-damaged buildings (26MW) was underway and expected to be completed by Q3 2026, with a significant portion of reconstruction costs recovered through the supplier's insurance coverage.","occurredAt":"2025-11-11T19:00:00.000Z","reviewStatus":"unreviewed","modelId":null,"deploymentId":null,"companyId":"3fd17461-d5be-49a7-88dd-0a88b278eda2","dataCenterId":null,"aliases":[],"collisionRisk":"none","reviewNote":null,"severity":"moderate","rootCauseCategory":null,"rootCauseDetail":null,"affectedUnitsCount":null,"affectedUnitsBasis":null,"remediationStatus":"in_progress","regulatoryAction":"none","regulatoryBody":null,"propertyDamageEstimateUsd":null,"damageEstimateBasis":null,"bodilyInjurySeverity":null,"fatalityCount":null,"lossCostClass":null,"sourceQualityTier":null,"oshaRecordable":null,"oshaCaseNumber":null,"rootCauseDisclosed":null,"publicDisclosureDate":null,"insuranceClaimPublic":null,"formFactor":null,"latitude":null,"longitude":null,"autonomyClass":null,"legalOutcomeClass":"unknown","createdAt":"2026-08-18T11:03:52.429Z","updatedAt":"2026-08-18T11:03:52.429Z","model":null,"deployment":null,"company":{"id":"3fd17461-d5be-49a7-88dd-0a88b278eda2","name":"Bitdeer Technologies","slug":"bitdeer-technologies","description":"Bitdeer Technologies Group (NASDAQ: BTDR) is a Singapore-based cryptocurrency mining and AI cloud infrastructure company founded in January 2021 as a spin-off from Bitmain by Jihan Wu. The company operates Bitcoin mining data centers across the United States, Norway, Bhutan, Ethiopia, and Malaysia with 1.6 GW of energized electrical capacity, and is converting several sites into AI data centers stocked with NVIDIA GPUs. Its [SEALMINER A4](/models/sealminer-a4) bitcoin mining rig uses proprietary SEAL04 chips for energy-efficient hashing. In August 2026, Bitdeer announced a 16-year colocation lease with Volta Infra Holdings for its Tydal, Norway campus to host NVIDIA Vera Rubin GPUs for a leading AI lab.","status":null,"founded":2021,"hq":"Singapore","hqLat":null,"hqLng":null,"hqGeocodedAt":null,"hqAddress":null,"hqPrecision":null,"website":null,"fundingTotal":null,"type":null,"reviewStatus":"reviewed","lifecycleState":"active","supersededByCompanyId":null,"sources":[],"keyFacts":[{"label":"CEO","value":"Jihan Wu"},{"label":"Ticker","value":"NASDAQ: BTDR"},{"label":"Revenue","value":"US$620.3M (FY2025)"},{"label":"Self-mining hashrate","value":"41.2 EH/s (Oct 2025)"},{"label":"Power capacity","value":"1,611 MW energized; 2,992 MW total global"},{"label":"AI cloud ARR","value":"US$8M (Oct 2025)"},{"label":"Bitcoin held","value":"2,233 BTC (Oct 2025)"},{"label":"Hero image candidate","value":"https://upload.wikimedia.org/wikipedia/en/thumb/e/eb/Bitdeer_logo.png/250px-Bitdeer_logo.png (source: Wikimedia Commons)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"BTDR","stockExchange":"NASDAQ","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":471,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-18T04:03:16.324Z","updatedAt":"2026-08-18T17:16:44.802Z"},"derived":{"status":"active"},"sources":[{"id":"caaaafb1-e30f-4e1b-b9fc-c21edc438411","incidentId":"04fa129b-6e90-47ed-93dc-4613029ffec0","url":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-reports-fire-incident-massillon-development-site","label":"Bitdeer IR","publishedAt":"2025-11-11T00:00:00.000Z","notes":null,"title":null,"sourceName":"Bitdeer IR","mediaType":"article","videoId":null,"channel":null,"durationSec":null,"timestampSec":null,"createdAt":"2026-08-18T11:03:52.429Z","updatedAt":"2026-08-18T11:03:52.429Z"}],"responses":[],"statusEvents":[{"id":"49266a32-98d6-40e8-a68f-0947bbd9bc01","incidentId":"04fa129b-6e90-47ed-93dc-4613029ffec0","status":"active","reason":null,"source":"agent:recon","effectiveAt":"2026-08-18T11:03:53.605Z","createdAt":"2026-08-18T11:03:53.605Z"}],"jsonLd":{"@context":"https://schema.org","@type":"NewsArticle","@id":"https://registry.deploy.report/incidents/bitdeer-massillon-fire-2025-11","url":"https://registry.deploy.report/incidents/bitdeer-massillon-fire-2025-11","headline":"Fire damages two buildings at Bitdeer Massillon, Ohio data center construction site","description":"On November 11, 2025, a fire broke out at Bitdeer's under-construction data center in Massillon, Ohio, damaging two of the 26 buildings in the complex. No personal injuries were reported. The Massillon Fire Department found no signs of arson. Bitdeer reported that reconstruction of the two fire-damaged buildings (26MW) was underway and expected to be completed by Q3 2026, with a significant portion of reconstruction costs recovered through the supplier's insurance coverage.","identifier":"04fa129b-6e90-47ed-93dc-4613029ffec0","datePublished":"2025-11-11T19:00:00.000Z","articleSection":"property damage","publisher":{"@id":"https://deploy.report/#organization"},"author":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"unreviewed","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":["primary-company-ir"]}}}