{"id":"1984868c-32cd-4a72-b4e0-0db6b5c4b4bd","slug":"tepco-fukushima-daiichi-nuclear-disaster-2011","kind":"other","headline":"Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning","summary":"On March 11, 2011, a magnitude 9.0 earthquake and a tsunami about 15 meters high struck the Fukushima Daiichi Nuclear Power Station, flooding the diesel generators and damaging the seawater cooling pumps. The cores of three reactors largely melted in the first three days, hydrogen explosions damaged the plant buildings, and radioactive material was released. Three TEPCO employees at the Daiichi and Daini plants were killed directly by the earthquake and tsunami. Decommissioning is expected to take 30 to 40 years, with large-scale fuel debris retrieval using robotic arms targeted for the first half of the 2030s.","occurredAt":"2011-03-11T14:46:00.000Z","reviewStatus":"reviewed","modelId":null,"deploymentId":null,"companyId":"1a18c6df-ef58-4a1d-9ae0-11fbc237fc68","dataCenterId":null,"aliases":[],"collisionRisk":"none","reviewNote":null,"severity":"catastrophic","rootCauseCategory":"other","rootCauseDetail":"Magnitude 9.0 earthquake and 15-meter tsunami disabled emergency diesel generators, causing total loss of cooling at Units 1-3.","affectedUnitsCount":null,"affectedUnitsBasis":null,"remediationStatus":"in_progress","regulatoryAction":"other","regulatoryBody":"NRA (Japan Nuclear Regulation Authority)","propertyDamageEstimateUsd":null,"damageEstimateBasis":null,"bodilyInjurySeverity":null,"fatalityCount":null,"lossCostClass":null,"sourceQualityTier":null,"oshaRecordable":null,"oshaCaseNumber":null,"rootCauseDisclosed":null,"publicDisclosureDate":null,"insuranceClaimPublic":null,"formFactor":null,"latitude":null,"longitude":null,"autonomyClass":null,"legalOutcomeClass":"unknown","createdAt":"2026-08-31T15:06:22.485Z","updatedAt":"2026-11-01T16:30:54.994Z","model":null,"deployment":null,"company":{"id":"1a18c6df-ef58-4a1d-9ae0-11fbc237fc68","name":"TEPCO","slug":"tepco","description":"Tokyo Electric Power Company Holdings (TEPCO) is Japan's largest electric utility and the operator of the Fukushima Daiichi Nuclear Power Station, where it pioneers robotic decommissioning using remotely operated and Spot quadruped robots from [Boston Dynamics](/companies/boston-dynamics). Since the 2011 disaster, TEPCO has deployed over 16 types of robots for fuel debris retrieval, radiation surveying, and facility inspection — including the Telesco telescopic device that extracted the first sample of melted fuel in 2024. Its subsidiary TEPCO Power Grid became the first Japanese power company to introduce an arm-equipped quadruped robot for underground substation inspections in 2025.","status":"public","founded":1951,"hq":"Tokyo, Japan","hqLat":35.6768601,"hqLng":139.7638947,"hqGeocodedAt":"2026-08-23T21:09:15.750Z","hqAddress":null,"hqPrecision":null,"website":"https://www.tepco.co.jp/en/","fundingTotal":null,"type":"hardware","roles":[],"reviewStatus":"reviewed","heatIndex":52,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.tepco.co.jp","title":"TEPCO — Tokyo Electric Power","sourceName":"TEPCO (official)"},{"url":"https://asia.nikkei.com/business/energy/japan-s-tepco-to-counter-capacity-squatters-in-ai-data-center-boom","title":"Japan's TEPCO to counter 'capacity squatters' in AI data center boom","sourceName":"Nikkei Asia","publishedAt":"2026-10-03"}],"keyFacts":[{"label":"Data center power rules (reported, Oct 2026)","value":"Tightening rules so data centers cannot reserve grid capacity they leave unused."}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"9501.T","stockExchange":"Tokyo Stock Exchange","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":null,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-09T05:08:50.338Z","updatedAt":"2026-10-21T00:50:33.687Z"},"derived":{"status":"active"},"sources":[{"id":"f1e493f7-49ff-4aa8-8b2d-ef726b48fc01","incidentId":"1984868c-32cd-4a72-b4e0-0db6b5c4b4bd","url":"https://world-nuclear.org/information-library/safety-and-security/safety-of-plants/fukushima-daiichi-accident","label":"World Nuclear Association","publishedAt":"2024-01-01T00:00:00.000Z","notes":null,"title":null,"sourceName":"World Nuclear Association","mediaType":"article","videoId":null,"channel":null,"durationSec":null,"timestampSec":null,"createdAt":"2026-08-31T15:06:22.485Z","updatedAt":"2026-08-31T15:06:22.485Z"},{"id":"fcf9fa6b-a3ba-4a40-bded-ace212b0951b","incidentId":"1984868c-32cd-4a72-b4e0-0db6b5c4b4bd","url":"https://en.wikipedia.org/wiki/Fukushima_nuclear_accident","label":"Wikipedia","publishedAt":"2024-01-01T00:00:00.000Z","notes":null,"title":null,"sourceName":"Wikipedia","mediaType":"article","videoId":null,"channel":null,"durationSec":null,"timestampSec":null,"createdAt":"2026-08-31T15:06:22.485Z","updatedAt":"2026-08-31T15:06:22.485Z"},{"id":"79624876-c74d-40ab-bfab-bf4800478a57","incidentId":"1984868c-32cd-4a72-b4e0-0db6b5c4b4bd","url":"https://www.iaea.org/topics/response/fukushima-daiichi-nuclear-accident","label":"IAEA","publishedAt":"2024-01-01T00:00:00.000Z","notes":null,"title":null,"sourceName":"IAEA","mediaType":"article","videoId":null,"channel":null,"durationSec":null,"timestampSec":null,"createdAt":"2026-08-31T15:06:22.485Z","updatedAt":"2026-08-31T15:06:22.485Z"}],"responses":[],"statusEvents":[],"jsonLd":{"@context":"https://schema.org","@type":"NewsArticle","@id":"https://registry.deploy.report/incidents/tepco-fukushima-daiichi-nuclear-disaster-2011","url":"https://registry.deploy.report/incidents/tepco-fukushima-daiichi-nuclear-disaster-2011","headline":"Fukushima Daiichi nuclear disaster: three reactor cores melt, starting a 30 to 40 year decommissioning","description":"On March 11, 2011, a magnitude 9.0 earthquake and a tsunami about 15 meters high struck the Fukushima Daiichi Nuclear Power Station, flooding the diesel generators and damaging the seawater cooling pumps. The cores of three reactors largely melted in the first three days, hydrogen explosions damaged the plant buildings, and radioactive material was released. Three TEPCO employees at the Daiichi and Daini plants were killed directly by the earthquake and tsunami. Decommissioning is expected to take 30 to 40 years, with large-scale fuel debris retrieval using robotic arms targeted for the first half of the 2030s.","identifier":"1984868c-32cd-4a72-b4e0-0db6b5c4b4bd","datePublished":"2011-03-11T14:46:00.000Z","articleSection":"other","publisher":{"@id":"https://deploy.report/#organization"},"author":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":3,"primary_source_types":["knowledge-base"]}}}