{"id":"68eabd3d-c82f-40b3-8c20-185cb53e0d9e","slug":"dataone-vineland-community-protest-2026-03","kind":"regulatory_action","headline":"Vineland NJ residents protest DataOne AI data center over environmental and health concerns","summary":"Approximately 100 Vineland, NJ residents gathered to protest DataOne's 350MW AI data center, citing concerns about air emissions, water usage near the Kirkwood-Cohansey aquifer, construction noise, and property values. The Vineland Planning Commission postponed a hearing on the company's energy plan, which includes a proposed 1.5-million-gallon LNG storage tank. NJDEP permit applications are under review. The facility plans to generate 85% of its power on-site using natural gas.","occurredAt":"2026-03-19T00:00:00.000Z","reviewStatus":"unreviewed","modelId":"61b8ee5b-2267-4d50-8f34-923ef50d454f","deploymentId":null,"companyId":null,"dataCenterId":null,"aliases":[],"collisionRisk":"none","reviewNote":null,"severity":"moderate","rootCauseCategory":null,"rootCauseDetail":null,"affectedUnitsCount":null,"affectedUnitsBasis":null,"remediationStatus":"none","regulatoryAction":"inquiry_opened","regulatoryBody":"NJDEP","propertyDamageEstimateUsd":null,"damageEstimateBasis":null,"bodilyInjurySeverity":null,"fatalityCount":null,"lossCostClass":null,"sourceQualityTier":null,"oshaRecordable":null,"oshaCaseNumber":null,"rootCauseDisclosed":null,"publicDisclosureDate":null,"insuranceClaimPublic":null,"formFactor":null,"latitude":null,"longitude":null,"autonomyClass":null,"legalOutcomeClass":"unknown","createdAt":"2026-08-19T09:06:39.390Z","updatedAt":"2026-08-19T09:06:39.390Z","model":{"id":"61b8ee5b-2267-4d50-8f34-923ef50d454f","companyId":"6dc05227-b83c-45e7-9238-9d2591c00358","modelName":"DataOne AI Factory","slug":"dataone-ai-factory","description":"Hyperscale AI data center infrastructure engineered for high-density GPU workloads, featuring direct liquid cooling, power densities of 60-500kW per rack, and PUE of 1.06-1.15. Deployed at 400MW scale in France and 300MW in Vineland, NJ.","formFactor":"other","industryVertical":null,"environment":null,"maturityStage":"production","lifecycleState":"active","supersededByModelId":null,"specs":{},"manufacturerSerial":null,"reviewStatus":"unreviewed","sources":[{"url":"https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre","label":"BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre","title":"BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre","mediaType":"article","sourceName":"BSO"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[],"createdAt":"2026-08-19T09:05:37.851Z","updatedAt":"2026-08-19T09:05:37.851Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null},"deployment":null,"company":null,"derived":{"status":"active"},"sources":[{"id":"61ccfa16-f4f8-43ad-93e5-4146f89bcd37","incidentId":"68eabd3d-c82f-40b3-8c20-185cb53e0d9e","url":"https://whyy.org/articles/data-center-artificial-intelligence-vineland-new-jersey/","label":"WHYY","publishedAt":"2026-03-19T00:00:00.000Z","notes":null,"title":null,"sourceName":"WHYY","mediaType":"article","videoId":null,"channel":null,"durationSec":null,"timestampSec":null,"createdAt":"2026-08-19T09:06:39.390Z","updatedAt":"2026-08-19T09:06:39.390Z"}],"responses":[],"statusEvents":[{"id":"7899a939-fe59-4ff9-9f32-8d4ba04aebd1","incidentId":"68eabd3d-c82f-40b3-8c20-185cb53e0d9e","status":"active","reason":null,"source":"agent:recon","effectiveAt":"2026-08-19T09:06:40.509Z","createdAt":"2026-08-19T09:06:40.509Z"}],"jsonLd":{"@context":"https://schema.org","@type":"NewsArticle","@id":"https://registry.deploy.report/incidents/dataone-vineland-community-protest-2026-03","url":"https://registry.deploy.report/incidents/dataone-vineland-community-protest-2026-03","headline":"Vineland NJ residents protest DataOne AI data center over environmental and health concerns","description":"Approximately 100 Vineland, NJ residents gathered to protest DataOne's 350MW AI data center, citing concerns about air emissions, water usage near the Kirkwood-Cohansey aquifer, construction noise, and property values. The Vineland Planning Commission postponed a hearing on the company's energy plan, which includes a proposed 1.5-million-gallon LNG storage tank. NJDEP permit applications are under review. The facility plans to generate 85% of its power on-site using natural gas.","identifier":"68eabd3d-c82f-40b3-8c20-185cb53e0d9e","datePublished":"2026-03-19T00:00:00.000Z","articleSection":"regulatory action","publisher":{"@id":"https://deploy.report/#organization"},"author":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"unreviewed","maturity_stage":null,"lifecycle_state":null,"architectural_position":{"cohort":null,"sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":[]}}}