{"id":"1c3dd83b-730c-42c2-8967-932cd5381df3","companyId":"e8f233ef-e13b-4ac5-b969-b179890cc737","modelName":"Eve eVTOL","slug":"eve-evtol","description":"Eve's lift-plus-cruise electric vertical takeoff and landing (eVTOL) aircraft, designed for urban air mobility. The full-scale engineering prototype completed its first flight on December 19, 2025 at Embraer's test facility in Brazil, with 50+ successful flights by April 2026. The aircraft features fly-by-wire controls and advanced energy management, with certification being pursued with FAA and ANAC.","formFactor":"aerial","industryVertical":"passenger_transport","environment":"airspace","maturityStage":"prototype","lifecycleState":"active","supersededByModelId":null,"specs":{},"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.eveairmobility.com/eve-air-mobility-secures-150-million-financing-to-accelerate-evtol-development/","title":"Eve Air Mobility Secures $150 Million Financing","sourceName":"Eve Air Mobility"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[{"label":"First flight","value":"December 19, 2025 (full-scale prototype)"},{"label":"Flight test progress","value":"50+ successful flights (April 2026)"}],"createdAt":"2026-07-06T05:25:30.445Z","updatedAt":"2026-07-12T04:24:53.980Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"jsonLd":{"@context":"https://schema.org","@type":"Product","@id":"https://registry.deploy.report/models/eve-evtol","url":"https://registry.deploy.report/models/eve-evtol","name":"Eve eVTOL","description":"Eve's lift-plus-cruise electric vertical takeoff and landing (eVTOL) aircraft, designed for urban air mobility. The full-scale engineering prototype completed its first flight on December 19, 2025 at Embraer's test facility in Brazil, with 50+ successful flights by April 2026. The aircraft features fly-by-wire controls and advanced energy management, with certification being pursued with FAA and ANAC.","identifier":"1c3dd83b-730c-42c2-8967-932cd5381df3","category":"aerial","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":"prototype","lifecycle_state":"active","architectural_position":{"cohort":"aerial","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":[]}}}