{"id":"1f722d2a-b9b2-47ab-93dc-e3eb7246310f","companyId":"571e2b9f-329e-4b65-a15e-f4da689c1ced","modelName":"Yara Birkeland","slug":"yara-birkeland-ship","description":"Fully autonomous electric container ship. 120 TEU capacity, zero emissions, autonomous navigation and docking. Route between Porsgrunn and Brevik, Norway. Operates with remote monitoring center.","formFactor":"maritime_surface","industryVertical":"maritime","environment":"surface_water","maturityStage":"commercial","lifecycleState":"active","supersededByModelId":null,"specs":{"max_speed":"13 kt","weight_kg":3200000,"payload_kg":3200000},"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.yara.com/news-and-media/news-archive/2022/yara-birkeland/","title":"Yara Birkeland","sourceName":"Yara"},{"url":"https://www.kongsberg.com/maritime/products/autonomous-solutions/","title":"Kongsberg autonomous","sourceName":"Kongsberg"},{"url":"https://en.wikipedia.org/wiki/Yara_Birkeland","title":"Yara Birkeland (re-verified primary source)"},{"url":"https://en.wikipedia.org/wiki/MV_Yara_Birkeland","title":"MV Yara Birkeland","sourceName":"Wikipedia"}],"aliases":[],"collisionRisk":"low","reviewNote":"reverified 2026-06-09 (Kimi-incident remediation): re-sourced against a current resolving authoritative source (manufacturer/regulator/reputable); relevance confirmed.","manufacturerTermForTeleop":null,"keyFacts":[{"label":"Ship cost","value":"5M (NOK 250M)"},{"label":"Battery capacity","value":"6.7 MWh"},{"label":"Capacity","value":"120 TEU containers"},{"label":"Route","value":"Herøya to Brevik, Norway (7 NM)"}],"createdAt":"2026-06-07T15:41:50.888Z","updatedAt":"2026-07-15T13:22:42.996Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"jsonLd":{"@context":"https://schema.org","@type":"Product","@id":"https://registry.deploy.report/models/yara-birkeland-ship","url":"https://registry.deploy.report/models/yara-birkeland-ship","name":"Yara Birkeland","description":"Fully autonomous electric container ship. 120 TEU capacity, zero emissions, autonomous navigation and docking. Route between Porsgrunn and Brevik, Norway. Operates with remote monitoring center.","identifier":"1f722d2a-b9b2-47ab-93dc-e3eb7246310f","category":"maritime_surface","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":"commercial","lifecycle_state":"active","architectural_position":{"cohort":"maritime_surface","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":4,"primary_source_types":["knowledge-base"]}}}