{"id":"61b8ee5b-2267-4d50-8f34-923ef50d454f","companyId":"6dc05227-b83c-45e7-9238-9d2591c00358","modelName":"DataOne AI Factory","slug":"dataone-ai-factory","description":"Hyperscale AI data center infrastructure engineered for high-density GPU workloads, featuring direct liquid cooling, power densities of 60-500kW per rack, and PUE of 1.06-1.15. Deployed at 400MW scale in France and 300MW in Vineland, NJ.","formFactor":"other","industryVertical":null,"environment":null,"maturityStage":"production","lifecycleState":"active","supersededByModelId":null,"specs":{},"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre","label":"BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre","title":"BSO Unveils DataOne: Europe's First Giga-Scale AI Hosting Data Centre","mediaType":"article","sourceName":"BSO"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[{"label":"Form Factor","value":"other"},{"label":"Maturity","value":"production"},{"label":"Grenoble and Lyon campus","value":"BSO said on 26 November 2024 that DataOne is an acquired Tier-3 campus in Grenoble (Eybens) and Lyon (Villefontaine), France, with 15 MW of IT load across 50,000 square meters and 14 hectares ([BSO](https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre))."},{"label":"AI capacity plan","value":"BSO says DataOne is planned to reach 80 MW in April 2025, 200 MW in the fourth quarter of 2026, and 400 MW in late 2028, with direct liquid cooling at 60 to 250 kW per rack and a PUE of 1.06 to 1.15 ([BSO](https://www.bso.co/all-insights/bso-unveils-dataone-europes-first-giga-scale-ai-hosting-data-centre))."}],"createdAt":"2026-08-19T09:05:37.851Z","updatedAt":"2026-10-03T18:00:04.187Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"jsonLd":{"@context":"https://schema.org","@type":"Product","@id":"https://registry.deploy.report/models/dataone-ai-factory","url":"https://registry.deploy.report/models/dataone-ai-factory","name":"DataOne AI Factory","description":"Hyperscale AI data center infrastructure engineered for high-density GPU workloads, featuring direct liquid cooling, power densities of 60-500kW per rack, and PUE of 1.06-1.15. Deployed at 400MW scale in France and 300MW in Vineland, NJ.","identifier":"61b8ee5b-2267-4d50-8f34-923ef50d454f","category":"other","publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":"production","lifecycle_state":"active","architectural_position":{"cohort":"other","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":[]}}}