{"id":"3b94938e-569e-4797-94b9-f475ccdb40f8","modelId":"11ff3cd4-3e0b-4cc8-b5bc-d6ae9dfdf7b0","versionId":null,"locationId":"ab0e29a3-a6eb-47c6-9930-500eb4219016","operatorId":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","ownerId":null,"slug":"aes-maximo-kern-county-california-usa","status":"operational","firstSeen":"2024-08-01T00:00:00.000Z","statusChangeReason":null,"contractType":null,"pilotOutcome":null,"endedAt":null,"unitsOnSite":null,"tasksPerformed":["autonomous_operation"],"shiftStructure":null,"hoursPerDay":8,"siteType":"farm","operatorConfirmed":null,"humanSupervisionOnsite":null,"locationPrecisionTier":"verified_coordinates","deploymentScale":"small_2_10","siteEnvironment":"outdoor","operatorType":null,"sourceQualityTier":2,"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.therobotreport.com/aes-maximo-robot-installs-100-megawatts-of-solar-capacity/","label":"AES Maximo robot installs 100 megawatts of solar capacity","title":"AES Maximo robot installs 100 megawatts of solar capacity","mediaType":"article","sourceName":"The Robot Report","publishedAt":"2024-08-01"}],"notes":"Maximo fleet of 4 robots installed 100 MW of solar capacity at the Bellefield solar-plus-storage project (2 GW total), the largest solar-plus-storage project in the US, under contract with Amazon.","keyFacts":[{"label":"Fleet size","value":"4 units"},{"label":"Capacity installed","value":"100 MW"}],"reviewNote":null,"exposureHours":null,"deploymentMilesEstimate":null,"exposureBasis":null,"customerSegment":"agriculture","scaleTier":"commercial_10_99","contractValueUsd":null,"contractValueBasis":null,"customerCompanyId":null,"customerExternalName":null,"createdAt":"2026-08-15T23:03:21.664Z","updatedAt":"2026-08-21T17:10:25.488Z","model":{"id":"11ff3cd4-3e0b-4cc8-b5bc-d6ae9dfdf7b0","companyId":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","modelName":"Maximo","slug":"aes-maximo","description":"Maximo is an AI-enabled solar installation robot developed by AES Corporation that automates the heavy lifting and placement of solar panels at utility-scale solar projects. It uses AI-powered computer vision for precise panel placement and can install panels in half the time and half the cost of traditional methods. Maximo has been validated in the field across multiple US project sites and has installed 100 MW of solar capacity at the Bellefield project in Kern County, California.","formFactor":"construction","industryVertical":"construction","environment":"outdoor","maturityStage":"production","lifecycleState":"active","supersededByModelId":null,"specs":{"class":"solar-installation robot","software":"AWS RoboMaker"},"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","sourceName":"AES / Renewable Energy World"},{"url":"https://www.aes.com/about-us/innovation/maximo","title":"AES Maximo AI solar robot","sourceName":"AES"},{"url":"https://www.aes.com/energy-insights/maximo-how-aes-incubated-first-its-kind-solar-field-robot","title":"How AES incubated a first-of-its-kind solar-field robot","sourceName":"AES"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[{"label":"Form factor","value":"construction"},{"label":"Class","value":"solar-installation robot"},{"label":"Software","value":"AWS RoboMaker"},{"label":"Operating speed","value":"roughly double installation speed versus manual crews"},{"label":"Solar-module installation","value":"AES describes Maximo as an AI-enabled robotic system that performs mechanical installation of solar modules, including picking, placing, and fastening panels to trackers ([AES Maximo](https://www.aes.com/about-us/innovation/maximo)).","sourceUrl":"https://www.aes.com/about-us/innovation/maximo"},{"label":"Worker-safety objective","value":"AES says Maximo is designed to automate heavy lifting and reduce physical strain for solar-field construction crews ([AES Maximo story](https://www.aes.com/energy-insights/maximo-how-aes-incubated-first-its-kind-solar-field-robot)).","sourceUrl":"https://www.aes.com/energy-insights/maximo-how-aes-incubated-first-its-kind-solar-field-robot"}],"createdAt":"2026-06-24T09:54:25.143Z","updatedAt":"2026-09-29T22:51:22.152Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"company":{"id":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","name":"AES Corporation","slug":"aes-corporation","description":"[AES Corporation](https://www.aes.com) (NYSE: AES) is a Fortune 500 global energy company headquartered in Arlington, Virginia. Founded in 1981, AES develops, owns, and operates power generation and utility infrastructure across the Americas. The company is the largest supplier of clean energy to corporations globally, with 11.8 GW of signed agreements to supply power to major technology firms. AES developed [Maximo](/models/maximo), an AI-enabled solar installation robot that automates panel placement at utility-scale solar projects.","status":"active","founded":1981,"hq":"Arlington, Virginia, USA","hqLat":38.8769326,"hqLng":-77.0893094,"hqGeocodedAt":"2026-08-05T14:17:56.006Z","hqAddress":null,"hqPrecision":null,"website":"https://www.aes.com","fundingTotal":"10700000000","type":"both","roles":["robot_maker","robot_operator"],"reviewStatus":"reviewed","heatIndex":79,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","title":"AES Maximo solar installation robot","date_accessed":"2026-06-24"}],"keyFacts":[{"label":"Robot","value":"Maximo, an AI-enabled solar-installation robot that lifts and places heavy PV modules"},{"label":"Technology","value":"Programmed with AWS RoboMaker"},{"label":"Focus","value":"Accelerating utility-scale solar construction across its project pipeline"},{"label":"Company","value":"US power company"},{"label":"Product","value":"Maximo AI drone inspection platform"},{"label":"Industry","value":"Energy (utility-scale power generation)"},{"label":"NYSE","value":"AES"},{"label":"Key robot","value":"Maximo AI solar installation robot"},{"label":"Maximo deployment","value":"Bellefield solar complex, Kern County, CA (100+ MW installed)"},{"label":"Financial stage","value":"Mature (NYSE: AES, $10B+ revenue, Maximo incubated as solar robotics venture)"},{"label":"Additional robot","value":"Atlas automated solar deployment robot (first of its kind)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"AES","stockExchange":"NYSE","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":8336,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-06-24T09:54:23.332Z","updatedAt":"2026-08-21T22:18:33.420Z"}},"version":null,"location":{"id":"ab0e29a3-a6eb-47c6-9930-500eb4219016","name":"Kern County, California, USA","slug":"kern-county-california-usa","kind":"county","parentLocationId":null,"region":"North America","lat":35.3145701,"lng":-118.753822,"reviewStatus":"reviewed","aliases":["Kern County","Bakersfield metropolitan area"],"collisionRisk":"moderate","reviewNote":"Kern County is a county in the U.S. state of California with a population of 909,235 (2020 census); its county seat is Bakersfield. It spans the southern end of the Central Valley and into the Mojave Desert. The AES Corporation's Bellefield solar-plus-storage project in Kern County is the largest solar-plus-storage project in the United States (2 GW total), where the Maximo robotic solar installation system has installed 100 MW of solar capacity. Sources: https://www.therobotreport.com/aes-maximo-robot-installs-100-megawatts-of-solar-capacity/ ; https://www.aboutamazon.com/news/sustainability/ai-powered-robot-amazon-solar-farms","createdAt":"2026-08-15T23:02:53.499Z","updatedAt":"2026-08-17T10:08:13.231Z"},"operator":{"id":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","name":"AES Corporation","slug":"aes-corporation","description":"[AES Corporation](https://www.aes.com) (NYSE: AES) is a Fortune 500 global energy company headquartered in Arlington, Virginia. Founded in 1981, AES develops, owns, and operates power generation and utility infrastructure across the Americas. The company is the largest supplier of clean energy to corporations globally, with 11.8 GW of signed agreements to supply power to major technology firms. AES developed [Maximo](/models/maximo), an AI-enabled solar installation robot that automates panel placement at utility-scale solar projects.","status":"active","founded":1981,"hq":"Arlington, Virginia, USA","hqLat":38.8769326,"hqLng":-77.0893094,"hqGeocodedAt":"2026-08-05T14:17:56.006Z","hqAddress":null,"hqPrecision":null,"website":"https://www.aes.com","fundingTotal":"10700000000","type":"both","roles":["robot_maker","robot_operator"],"reviewStatus":"reviewed","heatIndex":79,"lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","title":"AES Maximo solar installation robot","date_accessed":"2026-06-24"}],"keyFacts":[{"label":"Robot","value":"Maximo, an AI-enabled solar-installation robot that lifts and places heavy PV modules"},{"label":"Technology","value":"Programmed with AWS RoboMaker"},{"label":"Focus","value":"Accelerating utility-scale solar construction across its project pipeline"},{"label":"Company","value":"US power company"},{"label":"Product","value":"Maximo AI drone inspection platform"},{"label":"Industry","value":"Energy (utility-scale power generation)"},{"label":"NYSE","value":"AES"},{"label":"Key robot","value":"Maximo AI solar installation robot"},{"label":"Maximo deployment","value":"Bellefield solar complex, Kern County, CA (100+ MW installed)"},{"label":"Financial stage","value":"Mature (NYSE: AES, $10B+ revenue, Maximo incubated as solar robotics venture)"},{"label":"Additional robot","value":"Atlas automated solar deployment robot (first of its kind)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"AES","stockExchange":"NYSE","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":8336,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-06-24T09:54:23.332Z","updatedAt":"2026-08-21T22:18:33.420Z"},"owner":null,"derived":{"trustTier":"unverified","currentPosture":null},"jsonLd":{"@context":"https://schema.org","@type":"Event","@id":"https://registry.deploy.report/deployments/aes-maximo-kern-county-california-usa","url":"https://registry.deploy.report/deployments/aes-maximo-kern-county-california-usa","name":"Maximo at Kern County, California, USA","identifier":"3b94938e-569e-4797-94b9-f475ccdb40f8","startDate":"2024-08-01T00:00:00.000Z","location":{"@type":"Place","@id":"https://registry.deploy.report/locations/kern-county-california-usa","name":"Kern County, California, USA"},"organizer":{"@type":"Organization","@id":"https://registry.deploy.report/companies/aes-corporation","name":"AES Corporation"},"about":{"@type":"Product","@id":"https://registry.deploy.report/models/aes-maximo","name":"Maximo"},"publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":"production","lifecycle_state":"active","architectural_position":{"cohort":"construction","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":["secondary-trade-publication"]}}}