{"id":"b10af3d5-d333-491f-9254-2b26f6f1a976","modelId":"11ff3cd4-3e0b-4cc8-b5bc-d6ae9dfdf7b0","versionId":null,"locationId":"490d9a9b-bc99-429a-9c84-ae4680563006","operatorId":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","ownerId":null,"slug":"aes-maximo-bellefield-solar","status":"operational","firstSeen":"2026-03-01T00:00:00.000Z","statusChangeReason":null,"contractType":null,"pilotOutcome":null,"endedAt":null,"unitsOnSite":null,"tasksPerformed":null,"shiftStructure":null,"hoursPerDay":null,"siteType":null,"operatorConfirmed":null,"humanSupervisionOnsite":null,"locationPrecisionTier":null,"deploymentScale":null,"siteEnvironment":null,"operatorType":null,"sourceQualityTier":null,"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.solarpowerworldonline.com/2026/03/robots-install-100-mw-of-solar-panels-on-1-gw-aes-project/","title":"Robots install 100 MW of solar panels on 1-GW AES project","mediaType":"article","sourceName":"Solar Power World","publishedAt":"2026-03-25"}],"notes":"Four Maximo v3.0 solar-installation robots installed 100 MW of solar modules at the AES Bellefield project, a roughly 1 GW solar complex in Kern County, California. AES reported the robots exceeded a rate of one module per minute, described as the first at-scale robotic solar panel installation. AES Corporation owns and operates the project; Maximo is the AES-incubated robot.","keyFacts":[{"label":"Site","value":"AES Bellefield solar project (about 1 GW), Kern County, California"},{"label":"Units","value":"Four Maximo v3.0 robots"},{"label":"Scope milestone","value":"100 MW of modules installed"},{"label":"Rate","value":"Exceeded one module per minute"},{"label":"Significance","value":"First at-scale robotic solar panel installation (per AES)"}],"reviewNote":null,"exposureHours":null,"deploymentMilesEstimate":null,"exposureBasis":null,"customerSegment":null,"scaleTier":null,"contractValueUsd":null,"contractValueBasis":null,"customerCompanyId":null,"customerExternalName":null,"createdAt":"2026-07-12T15:08:31.410Z","updatedAt":"2026-07-12T15:21:04.790Z","model":{"id":"11ff3cd4-3e0b-4cc8-b5bc-d6ae9dfdf7b0","companyId":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","modelName":"Maximo","slug":"aes-maximo","description":"AES's Maximo is an AI-enabled solar-installation robot that lifts and precisely places heavy PV modules during utility-scale solar construction; programmed with AWS RoboMaker, it pairs computer vision with a manipulator to roughly double installation speed versus manual crews.","formFactor":"construction","industryVertical":"construction","environment":"outdoor","maturityStage":null,"lifecycleState":"active","supersededByModelId":null,"specs":{"class":"solar-installation robot","software":"AWS RoboMaker"},"manufacturerSerial":null,"reviewStatus":"reviewed","sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","sourceName":"AES / Renewable Energy World"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[{"label":"Form factor","value":"construction"},{"label":"Class","value":"solar-installation robot"},{"label":"Software","value":"AWS RoboMaker"},{"label":"Operating speed","value":"roughly double installation speed versus manual crews"}],"createdAt":"2026-06-24T09:54:25.143Z","updatedAt":"2026-07-12T04:24:55.379Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"company":{"id":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","name":"AES Corporation","slug":"aes-corporation","description":"[AES Corporation](https://www.aes.com) (NYSE: AES) is an American energy company headquartered in Arlington, Virginia. The company incubated Maximo, an AI-powered solar installation robot that automates utility-scale solar construction. Maximo has installed 100+ megawatts of solar capacity at AES's Bellefield complex in Kern County, California, installing panels in half the time and half the cost of manual labor.","status":"active","founded":1981,"hq":"Arlington, Virginia, USA","fundingTotal":null,"type":"both","reviewStatus":"reviewed","lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","title":"AES Maximo solar installation robot","date_accessed":"2026-06-24"}],"keyFacts":[{"label":"Robot","value":"Maximo, an AI-enabled solar-installation robot that lifts and places heavy PV modules"},{"label":"Technology","value":"Programmed with AWS RoboMaker"},{"label":"Focus","value":"Accelerating utility-scale solar construction across its project pipeline"},{"label":"Company","value":"US power company"},{"label":"Product","value":"Maximo AI drone inspection platform"},{"label":"Industry","value":"Energy (utility-scale power generation)"},{"label":"NYSE","value":"AES"},{"label":"Key robot","value":"Maximo AI solar installation robot"},{"label":"Maximo deployment","value":"Bellefield solar complex, Kern County, CA (100+ MW installed)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"createdAt":"2026-06-24T09:54:23.332Z","updatedAt":"2026-07-07T20:54:26.929Z"}},"version":null,"location":{"id":"490d9a9b-bc99-429a-9c84-ae4680563006","name":"Kern County","slug":"kern-county-ca","kind":"city","parentLocationId":"fdf937a9-5eeb-4e8d-a514-ef860b351b30","region":null,"lat":35.3733,"lng":-118.9016,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-07-12T15:08:16.170Z","updatedAt":"2026-07-12T15:08:16.170Z"},"operator":{"id":"15b3f7e9-4e51-4090-a09d-834bb02d2f23","name":"AES Corporation","slug":"aes-corporation","description":"[AES Corporation](https://www.aes.com) (NYSE: AES) is an American energy company headquartered in Arlington, Virginia. The company incubated Maximo, an AI-powered solar installation robot that automates utility-scale solar construction. Maximo has installed 100+ megawatts of solar capacity at AES's Bellefield complex in Kern County, California, installing panels in half the time and half the cost of manual labor.","status":"active","founded":1981,"hq":"Arlington, Virginia, USA","fundingTotal":null,"type":"both","reviewStatus":"reviewed","lifecycleState":"active","supersededByCompanyId":null,"sources":[{"url":"https://www.renewableenergyworld.com/solar/utility-scale/meet-maximo-the-ai-enabled-solar-installation-robot/","title":"AES Maximo solar installation robot","date_accessed":"2026-06-24"}],"keyFacts":[{"label":"Robot","value":"Maximo, an AI-enabled solar-installation robot that lifts and places heavy PV modules"},{"label":"Technology","value":"Programmed with AWS RoboMaker"},{"label":"Focus","value":"Accelerating utility-scale solar construction across its project pipeline"},{"label":"Company","value":"US power company"},{"label":"Product","value":"Maximo AI drone inspection platform"},{"label":"Industry","value":"Energy (utility-scale power generation)"},{"label":"NYSE","value":"AES"},{"label":"Key robot","value":"Maximo AI solar installation robot"},{"label":"Maximo deployment","value":"Bellefield solar complex, Kern County, CA (100+ MW installed)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"createdAt":"2026-06-24T09:54:23.332Z","updatedAt":"2026-07-07T20:54:26.929Z"},"owner":null,"derived":{"trustTier":"unverified","currentPosture":null},"jsonLd":{"@context":"https://schema.org","@type":"Event","@id":"https://registry.deploy.report/deployments/aes-maximo-bellefield-solar","url":"https://registry.deploy.report/deployments/aes-maximo-bellefield-solar","name":"Maximo at Kern County","identifier":"b10af3d5-d333-491f-9254-2b26f6f1a976","startDate":"2026-03-01T00:00:00.000Z","location":{"@type":"Place","@id":"https://registry.deploy.report/locations/kern-county-ca","name":"Kern County"},"organizer":{"@type":"Organization","@id":"https://registry.deploy.report/companies/aes-corporation","name":"AES Corporation"},"about":{"@type":"Product","@id":"https://registry.deploy.report/models/aes-maximo","name":"Maximo"},"publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"verified","maturity_stage":null,"lifecycle_state":"active","architectural_position":{"cohort":"construction","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":[]}}}