{"id":"d85e8bf9-de13-4c04-91d0-0ca0b4976e7d","modelId":"7da4e98b-0994-45f3-b32e-28aaf03b11a2","versionId":null,"locationId":"f83b1bb2-639e-480d-908e-7d9e1cb1412f","operatorId":null,"ownerId":null,"slug":"sealminer-a4-tydal-norway","status":"operational","firstSeen":"2025-10-01T00:00:00.000Z","statusChangeReason":null,"contractType":null,"pilotOutcome":null,"endedAt":null,"unitsOnSite":null,"tasksPerformed":null,"shiftStructure":null,"hoursPerDay":null,"siteType":null,"operatorConfirmed":null,"humanSupervisionOnsite":null,"locationPrecisionTier":null,"deploymentScale":null,"siteEnvironment":null,"operatorType":null,"sourceQualityTier":null,"manufacturerSerial":null,"reviewStatus":"unreviewed","sources":[{"url":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-october-2025-production-and-operations-update","label":"Bitdeer Announces October 2025 Production and Operations Update","title":"Bitdeer Announces October 2025 Production and Operations Update","mediaType":"article","sourceName":"Bitdeer Investor Relations","publishedAt":"2025-10-01"}],"notes":"225 MW hydro-cooling data center site completed and fully energized. SEALMINER A2/A3 rigs deployed for Bitcoin self-mining. Site is being converted to an AI data center with 121 critical IT MW leased to Volta Infra Holdings for NVIDIA GPU hosting under a 16-year agreement.","keyFacts":[{"label":"Power capacity","value":"225 MW"}],"reviewNote":null,"exposureHours":null,"deploymentMilesEstimate":null,"exposureBasis":null,"customerSegment":null,"scaleTier":null,"contractValueUsd":null,"contractValueBasis":null,"customerCompanyId":null,"customerExternalName":null,"createdAt":"2026-08-18T13:07:53.107Z","updatedAt":"2026-08-18T13:07:53.107Z","model":{"id":"7da4e98b-0994-45f3-b32e-28aaf03b11a2","companyId":"3fd17461-d5be-49a7-88dd-0a88b278eda2","modelName":"SEALMINER A4","slug":"sealminer-a4","description":"The SEALMINER A4 is Bitdeer's fourth-generation bitcoin mining rig powered by proprietary SEAL04 ASIC chips, achieving approximately 9.45 J/TH power efficiency. Mass production commenced in Q1 2026. The SEAL04 chip has demonstrated 6-7 J/TH at the chip level under low-voltage, ultra-power-saving mode. The rigs are deployed across Bitdeer's global data center network for self-mining operations.","formFactor":"other","industryVertical":null,"environment":null,"maturityStage":"production","lifecycleState":"active","supersededByModelId":null,"specs":{},"manufacturerSerial":null,"reviewStatus":"unreviewed","sources":[{"url":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-launches-sealminer-a4-series-bitcoin-mining-rigs/","label":"Bitdeer Launches SEALMINER A4 Series Bitcoin Mining Rigs","title":"Bitdeer Launches SEALMINER A4 Series Bitcoin Mining Rigs","mediaType":"article","sourceName":"Bitdeer IR"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"manufacturerTermForTeleop":null,"keyFacts":[],"createdAt":"2026-08-18T09:04:14.384Z","updatedAt":"2026-08-18T13:09:20.240Z","unitsInFieldClaimed":null,"unitsInFieldVerified":null,"unitsManufacturedClaimed":null,"unitsManufacturedVerified":null,"unitsAsOf":null,"unitsSource":null,"salesModel":null,"priceUndisclosedSince":null,"autonomyClass":null,"autonomyStatement":null,"autonomyStatementSource":null,"demoForensics":null,"exportControlClass":null,"minCommitment":null,"warrantyTerms":null,"serviceModel":null,"productionRateClaimed":null,"productionRateEvidenced":null,"teleopRatioDisclosed":null,"interventionRateDisclosed":null,"company":{"id":"3fd17461-d5be-49a7-88dd-0a88b278eda2","name":"Bitdeer Technologies","slug":"bitdeer-technologies","description":"Bitdeer Technologies Group (NASDAQ: BTDR) is a Singapore-based cryptocurrency mining and AI cloud infrastructure company founded in January 2021 as a spin-off from Bitmain by Jihan Wu. The company operates Bitcoin mining data centers across the United States, Norway, Bhutan, Ethiopia, and Malaysia with 1.6 GW of energized electrical capacity, and is converting several sites into AI data centers stocked with NVIDIA GPUs. Its [SEALMINER A4](/models/sealminer-a4) bitcoin mining rig uses proprietary SEAL04 chips for energy-efficient hashing. In August 2026, Bitdeer announced a 16-year colocation lease with Volta Infra Holdings for its Tydal, Norway campus to host NVIDIA Vera Rubin GPUs for a leading AI lab.","status":null,"founded":2021,"hq":"Singapore","hqLat":null,"hqLng":null,"hqGeocodedAt":null,"hqAddress":null,"hqPrecision":null,"website":null,"fundingTotal":null,"type":null,"reviewStatus":"reviewed","lifecycleState":"active","supersededByCompanyId":null,"sources":[],"keyFacts":[{"label":"CEO","value":"Jihan Wu"},{"label":"Ticker","value":"NASDAQ: BTDR"},{"label":"Revenue","value":"US$620.3M (FY2025)"},{"label":"Self-mining hashrate","value":"41.2 EH/s (Oct 2025)"},{"label":"Power capacity","value":"1,611 MW energized; 2,992 MW total global"},{"label":"AI cloud ARR","value":"US$8M (Oct 2025)"},{"label":"Bitcoin held","value":"2,233 BTC (Oct 2025)"},{"label":"Hero image candidate","value":"https://upload.wikimedia.org/wikipedia/en/thumb/e/eb/Bitdeer_logo.png/250px-Bitdeer_logo.png (source: Wikimedia Commons)"}],"aliases":[],"collisionRisk":"low","reviewNote":null,"atsProvider":null,"atsSlug":null,"factoryLocations":null,"manufacturingCapacity":null,"orgType":null,"burnSignal":null,"litigationEvents":null,"insurancePostureDisclosed":null,"unitEconomicsDisclosed":null,"tickerSymbol":"BTDR","stockExchange":"NASDAQ","secCik":null,"revenueUsd":null,"revenueBasis":null,"revenueAsOf":null,"employeeCount":471,"employeeCountBasis":null,"employeeCountAsOf":null,"marketCapUsd":null,"marketCapAsOf":null,"marketCapSource":null,"createdAt":"2026-08-18T04:03:16.324Z","updatedAt":"2026-08-18T17:16:44.802Z"}},"version":null,"location":{"id":"f83b1bb2-639e-480d-908e-7d9e1cb1412f","name":"Tydal, Norway","slug":"tydal-norway","kind":"facility","parentLocationId":null,"region":null,"lat":62.9712367,"lng":11.8215048,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":"Coordinates auto-geocoded on create via OpenStreetMap Nominatim (unverified; confirm before relying on map placement).","createdAt":"2026-08-18T09:04:35.643Z","updatedAt":"2026-08-18T13:07:35.721Z"},"operator":null,"owner":null,"derived":{"trustTier":"unverified","currentPosture":null},"jsonLd":{"@context":"https://schema.org","@type":"Event","@id":"https://registry.deploy.report/deployments/sealminer-a4-tydal-norway","url":"https://registry.deploy.report/deployments/sealminer-a4-tydal-norway","name":"SEALMINER A4 at Tydal, Norway","identifier":"d85e8bf9-de13-4c04-91d0-0ca0b4976e7d","startDate":"2025-10-01T00:00:00.000Z","location":{"@type":"Place","@id":"https://registry.deploy.report/locations/tydal-norway","name":"Tydal, Norway"},"organizer":{"@type":"Organization","@id":"https://registry.deploy.report/companies/bitdeer-technologies","name":"Bitdeer Technologies"},"about":{"@type":"Product","@id":"https://registry.deploy.report/models/sealminer-a4","name":"SEALMINER A4"},"publisher":{"@id":"https://deploy.report/#organization"}},"framework_metadata":{"framework_schema_version":"0.1.0","verification_status":"unreviewed","maturity_stage":"production","lifecycle_state":"active","architectural_position":{"cohort":"other","sub_cohorts":[]},"within_cohort_verified_vs_claimed_pair":null,"cap_flags":[],"verification_depth":{"sources_count":1,"primary_source_types":["primary-company-ir"]}}}