DEPLOYThe reference layer for physical AI

Deployment

DEEP Robotics X20 at Global

Industrial inspection quadruped (~53-57 kg, IP66, ~15 km range, 20 kg payload). Autonomous multi-sensor-fusion inspection (LiDAR + RTK), obstacle avoidance and terrain recognition; operates in complete darkness via multi-sensor SLAM. Distinct from the X30.

DEEP Robotics X20 by DEEP Robotics · Catalog entry · 1 source · not yet field-verified


Machine-readable surfaces

Aggregate global deployment. DEEP Robotics X20 operations.

Trust tier
Catalog entry · 1 source · not yet field-verified
Last updated
2026-06-08
Model
DEEP Robotics X20
Company
DEEP Robotics
Location
Global
Status
operational
ID
3fcd4e4d-37b1-4678-88dc-38b0085e6718

Sources (1)

  1. https://rover.report
Methodology: Verified · 1 source (no primary) · last reviewed 2026-06-08

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-06-08

Maturity + lifecycle

Maturity stage: commercial

Lifecycle: active

Architectural position

Cohort: quadruped

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for DEEP Robotics X20 at Global.

Common questions

What is the DEEP Robotics X20 deployment at Global?
DEEP Robotics X20, built by DEEP Robotics, is recorded as a deployment at Global on the DEPLOY registry. DEEP Robotics operates the deployment directly.
Who operates DEEP Robotics X20 at Global?
DEEP Robotics, the manufacturer of DEEP Robotics X20, operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
Have there been incidents at the DEEP Robotics X20 deployment at Global?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.