DEPLOYThe reference layer for physical AI

Deployment

Ripsaw M5 (RCV) at North America

~10.5-ton tracked hybrid-electric robotic combat vehicle (with Howe & Howe); four M5 prototypes delivered to the US Army for RCV-Medium. The lighter Ripsaw M3 was reported as the 2025 RCV down-select variant.

Ripsaw M5 (RCV) by Textron Systems · Catalog entry · 1 source · not yet field-verified


Machine-readable surfaces

North American operational deployment. Ripsaw M5 (RCV) operations.

Trust tier
Catalog entry · 1 source · not yet field-verified
Last updated
2026-06-08
Model
Ripsaw M5 (RCV)
Company
Textron Systems
Location
North America
Status
operational
ID
55ac3cec-b26f-464f-a6a4-73f6ac47d111

Sources (1)

  1. https://rover.report
Methodology: Verified · 1 source (no primary) · last reviewed 2026-06-08

Verification posture

Verified

Low confidence

Review state

Stable

Last reviewed 2026-06-08

Maturity + lifecycle

Maturity stage: pilot

Lifecycle: active

Architectural position

Cohort: defense_ugv

Sources by quality tier

1
unclassified
Unclassified source

The framework is documented at /methodology. Corrections at /corrections. Reviewer: DEPLOY editorial team.

Methodology surface for Ripsaw M5 (RCV) at North America.

Common questions

What is the Ripsaw M5 (RCV) deployment at North America?
Ripsaw M5 (RCV), built by Textron Systems, is recorded as a deployment at North America on the DEPLOY registry. Textron Systems operates the deployment directly.
Who operates Ripsaw M5 (RCV) at North America?
Textron Systems, the manufacturer of Ripsaw M5 (RCV), operates this deployment directly. This is a maker-deploys-its-own-product arrangement rather than a customer pilot.
Have there been incidents at the Ripsaw M5 (RCV) deployment at North America?
No active incidents affecting this deployment are recorded on the DEPLOY registry. Absence of recorded incidents is not a guarantee no incident occurred; DEPLOY records only sourced incidents and suppresses retracted ones.

Deploy Watch

Track this deployment.

We notify you when status changes against primary-source evidence, contract events surface, or a related incident is filed.