DEPLOYThe reference layer for physical AI

Revision history

337-TA-1363 revision history

Append-only Arc G field-change log. 3 material events; 0 editorial events. Newest first.


Patent litigation

Back to 337-TA-1363

Recorded posture

  • First recorded event: 2023-04-11
  • Last material change: 2026-06-06

Material events (3)

  • 2026-06-06: created (source: baseline:arc-g)
  • 2023-10-10: status_change on status set to terminated (source: https://investor.hesaitech.com/news-releases/news-release-details/international-trade-commission-confirms-terminate-patent) (verified)
  • 2023-04-11: status_change on status set to filed (source: https://www.businesswire.com/news/home/20230412005325) (verified)

Forward-only note

Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.

Machine-readable: /patent-litigations/ouster-v-hesai-itc-337-ta-1363/history.md.