Revision history
Ouster acquires Velodyne LiDAR revision history
No events on file. Arc G is forward-only; the recorded event log accrues from Arc G adoption (2026-06-04). For the current state of this acquisition see the acquisition page.
Acquisition
Forward-only note
Arc G is forward-only. The event log accrues from the Arc G adoption point. Fields with no events post-baseline equal the current cached value and are not independently verified at any prior date.
Machine-readable: /acquisitions/ouster-velodyne-merger-2023/history.md + REST /v1/acquisitions/a3c12976-9732-44f1-8486-cc7376d38afa/history.