Data center campus
Stargate Abilene
Stargate Abilene is an announced AI data center campus. 1.20 GW of capacity has been announced; 0.30 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Private land · ERCOT · Abilene, Texas, United States
Capacity: announced vs energized
Announced
1.20 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
0.30 GW
reported
Announced-to-energized gap: 0.90 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.20 GW | 2026-03-09 | reported | journalist report |
| Announced | 2.10 GW | 2025-09-01 | claimed | journalist report |
| Energized | 0.30 GW | 2026-06-30 | reported | journalist report |
The deal
- tenant
- OpenAI · Anchor of the Stargate project.
- developer
- Oracle · Cloud provider / co-developer.
- financier
- SoftBank · Stargate investment partner.
- construction
- Crusoe · Built the site.
- chip supplier
- Nvidia · Nvidia Blackwell chips.
- grid operator
- ERCOT · Grid-interconnection delays exceeding a year drove the 1.2 GW cap.
Power
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
Sources
- OpenAI and Oracle Cap Texas AI Data Center at 1.2 GW · WinBuzzer
- OpenAI Stargate: where the US sites stand · Epoch AI