What are the largest neoclouds by capacity?

The largest neocloud by live, operational power is CoreWeave (about 1,500 MW active), while the biggest announced buildout is Nebius (about 5,000 MW). Power is the comparable axis; live and announced are ranked separately so a plan is never mistaken for a running site.


Top of the list (live power)

  1. #1
    CoreWeave
    1,500 MW live · 4,200 MW planned
  2. #2
    YTL AI Cloud
    600 MW live
  3. #3
    Nebius
    170 MW live · 5,000 MW planned

Ranked by live (operational) power

Neoclouds ranked by live operational data-center power
CoreWeaveNorth America1,500 MW~250,000 (last disclosed, end-2024)NVIDIA H100 / H200 / GB200 NVL72
YTL AI CloudAsia600 MWNVIDIA GB200 NVL72 (count undisclosed)
NebiusEurope170 MW~60,000 (reported)NVIDIA H100 / H200 / B200 / GB200
Sify TechnologiesAsia129 MWNVIDIA (H100 / H200 / GB200; deployed count undisclosed)
Voltage ParkNorth America60 MW~24,000 NVIDIA H100 (~35,000+ combined post-Lightning merger)NVIDIA H100 (B200 / GB300 added)
Core42Middle East60 MWup to 35,000 GB300-equivalent (US export-approved); 10,000 via Northern DataNVIDIA H100 / H200 (+ AMD, Cerebras WSE-3)

Power that is energized and running today. Figures are drawn from each operator’s sourced record.

Ranked by announced / planned power

Neoclouds ranked by announced or contracted data-center power
NebiusEurope5,000 MW~60,000 (reported)NVIDIA H100 / H200 / B200 / GB200
CrusoeNorth America4,900 MWNVIDIA GB200 / B200 / H200 + AMD MI300X
CoreWeaveNorth America4,200 MW~250,000 (last disclosed, end-2024)NVIDIA H100 / H200 / GB200 NVL72
LambdaNorth America3,000 MW>1,000,000 target by 2030NVIDIA H100 / B200 / GB300 NVL72
TensorWaveNorth America1,000 MW8,192 AMD Instinct MI325X (largest AMD cluster in North America)AMD Instinct MI325X / MI300X / MI355X
IRENNorth America750 MW~150,000 target
HUMAINMiddle East500 MW18,000 NVIDIA GB300 (first phase)NVIDIA GB300 (Grace Blackwell Ultra)
FluidstackNorth America360 MWNVIDIA H100 / H200 / B200 / GB200
Northern DataEurope250 MW~22,000 NVIDIA H100 / H200 (>85% allocated)NVIDIA H100 / H200
NscaleEurope240 MW~200,000 NVIDIA GB300 (Microsoft, phased 2026-27)NVIDIA GB300 / GB200 / H100 + AMD MI300X
Jio PlatformsAsia120 MW>200,000 H100-equivalent at full build (H100-equivalent, not raw count)NVIDIA GB300 (Blackwell Ultra)
Sustainable Metal CloudAsia84 MW~54,000 NVIDIA GB300 (Project Southgate)NVIDIA H100 (GB300 planned); immersion-cooled
KrutrimAsia20 MWNVIDIA GB200 NVL72 / H100
GMI CloudAsia16 MW7,000 NVIDIA GB300 (Taiwan AI Factory, go-live ~Mar 2026)NVIDIA GB300 NVL72

Contracted or targeted capacity being built. An announcement is not a running site; see the biggest AI data centers for the same distinction at campus level.

GPU fleet disclosed, power not

Common questions

What is the largest neocloud?

By live, operational data-center power, the largest neocloud DEPLOY tracks is CoreWeave at about 1,500 MW active. By announced or contracted capacity the leader is Nebius at about 5,000 MW. Live and announced are different facts, and both are shown so a plan is never presented as a running site.

Why rank by power instead of GPU count?

Because power is the axis operators actually disclose and the one that is comparable. Most large neoclouds have stopped publishing a single GPU number and now report megawatts, and the GPU figures that do exist mix verified deployments, announced orders, and H100-equivalent estimates that cannot be ranked against each other. Power in megawatts is the honest common denominator; GPU fleet is shown as a secondary column where a credible figure exists.

Which neocloud has the most GPUs?

It depends on whether you count deployed or announced, and the honest answer is that the very largest operators no longer disclose a hard total. Among verified fleets, Northern Data (~22,000 H100/H200) and Voltage Park (~24,000 H100) publish clear numbers; the biggest announced fleets (Lambda's 1,000,000 by 2030, HUMAIN's up to 600,000, Nscale's ~200,000 GB300) are targets, not running hardware.

Are these figures operational or announced?

Both, shown separately. The live table ranks power that is energized and running today; the announced/planned table ranks contracted or targeted capacity that is being built. Each figure is drawn from the operator's sourced registry record, with its status kept explicit rather than blended into one number.