The biggest AI data centers, ranked by capacity

The largest campus DEPLOY tracks is SpaceX Cochise County Supercompute Campus at about 6 GW announced. Here is the full ranking, with announced gigawatts next to what is actually energized, so a headline is never mistaken for a running site.


The top of the list

  1. #1
    SpaceX Cochise County Supercompute Campus
    6 GW announced
  2. #2
    Kurnool Green Compute Factory
    2 GW announced
  3. #3
    Fluidstack Cameron County AI Campus
    1.50 GW announced

Every ranked campus

AI data center campuses ranked by announced capacity
1SpaceX Cochise County Supercompute CampusCochise County, Arizonaannounced6-
2Kurnool Green Compute FactoryKurnool district, Andhra Pradeshannounced2-
3Fluidstack Cameron County AI CampusCameron Countyunder construction1.50-
4Nebius Independence AI FactoryMissouriunder construction1.20-
5Google West Creek Campus (Goochland, Virginia)Goochland Countyrumored1.20-
6Nebius Highridge Business Park AI FactoryButler Township (Schuylkill County)under construction1.20-
7Kraft Group Sutton Data Center CampusSuttonannounced0.90-
8Crusoe Abilene Microsoft AI Factory CampusAbileneunder construction0.90-
9Crossroads Technology Campus (Spotsylvania County)Virginiapermitted0.89-
10AM AI Factory Visakhapatnam AI Data CentreVisakhapatnamannounced0.51-
11BDx CGK4 AI Data Center Park (West Java)Jatiluhur (Purwakarta)partially energized0.50-
12VITRO Sta. Rosa (Santa Rosa, Laguna)Santa Rosa, Laguna, Philippinesenergized0.500.05
13KMG Jakarta AI Data CenterJakartaenergized0.400.03
14STN Odessa CampusOdessaannounced0.35-
15PowerHouse Circle T CampusWestlakepermitted0.30-
16Delta Forge 1 (Boyce / Rapides Parish)Boyceunder construction0.30-
17Project Southgate (Bell Bay, Tasmania)Bell Bay, Tasmania, Australiapermitted0.29-
18Yotta NM1 Data Center (Navi Mumbai)Navi Mumbaienergized0.250.05
19EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)Renopartially energized0.22-
20Macquarie Engineering and Technology CampusMacquarie Parkannounced0.20-
215C Mount Carmel Township data center campus (Northumberland County, Pennsylvania)Pennsylvaniaannounced0.16-
22Viettel Data Center (Cu Chi, Ho Chi Minh City)Cu Chi District, Ho Chi Minh City, Vietnamunder construction0.14-
23Samsung SDS Gumi AI Data CenterGumi Complex, North Gyeongsang, South Koreaunder construction0.12-
24Drax Power Station Data CentreDrax Power Station, North Yorkshireannounced0.10-
25Akashi Data Center (Astana)Astana, Kazakhstanunder construction0.100.05
26Siam AI Data Center (Thailand)Chonburiunder construction0.10-
27Aetheris Cottle County data center (Triangle Ranch, Texas)Texasannounced0.10-
28EdgeConneX Cedar Creek Campus (CoreWeave AUS02)Cedar Creekunder construction0.10-
29Data4 Athens Campus (Paiania)Greecepartially energized0.09-
30RackBank GigaCampus (Indore)Pithampur, Indore, Madhya Pradesh, Indiaunder construction0.08-
31SKT AI Data Center (Gasan, Seoul)Gasan-dong, Geumcheon-gu, Seoulenergized0.08-
32CyrusOne KEP OSK1 (Kansai, Japan)Japanunder construction0.05-
35Patmos Fairfield Technology CampusAlabamaannounced0.02-
36Vultr Chennai AI SuperclusterChennai, Indiaannounced0.02-
38GMI Cloud Taiwan AI Factory (Taoyuan)Taoyuan, Taiwanpartially energized0.02-
33Ooredoo / Syntys AI Cloud (Qatar)Doha, Qatarpartially energized-0.03
34STTGDC NOI2Noida, Uttar Pradesh, Indiaenergized-0.02
37GreenNode AI Cloud Cluster (Bangkok, STT Bangkok 1)Bangkok, Thailandenergized-0.02

Ranked by announced gigawatts. DEPLOY is neutral infrastructure: it publishes what is claimed, what is verified, and when, without taking a position for or against any project. See the announced vs energized answer for the aggregate gap.

Free to use on your site, with a link back to DEPLOY.

Common questions

What is the biggest AI data center?

By announced capacity, the largest campus DEPLOY tracks is SpaceX Cochise County Supercompute Campus at about 6 GW announced. Announced size and running size are different facts, and both are shown.

Why rank by announced instead of energized?

Because most of the largest sites are still being built, so their energized capacity is near zero. Announced gigawatts is the honest way to rank ambition, but energized is shown in the same row so a plan is never presented as an operating facility. See how many are actually running.

Are these campuses or buildings?

Campuses. Only the flagship campus tier carries a gigawatt ledger. The wider colocation and hyperscale facilities are counted in the US total and the operator and state rankings, but they are ranked by count and IT capacity, not gigawatts.

How is each figure verified?

Every capacity figure carries an evidence tier (verified, reported, or claimed), an as-of date, and a primary source. The current-best figure resolves to the highest tier then the latest date, excluding superseded claims. The methodology page has the full rule.