Data center campus
STN Odessa Campus
STN Odessa Campus is an AI data center campus developed by ChronoScale in Texas, Ector County. 0.35 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · ChronoScale · Odessa, Ector County, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.35 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.35 GW | 2026-11-18 | claimed | press release |
| Contracted | 0.07 GW | 2026-11-18 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on STN Odessa Campus. Pan or zoom out to see how close rivals are building.
In clusterEctor County(8)·Texas(611)
The deal
- developer
- STN, Inc.
- developer
- ChronoScale
Power
- Interconnection
County water status: No drought in Ector County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
STN Odessa Campus is in Texas, Ector County. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedcontracted: unknown to 0.065
- Nov 2026Current: Announced
Sources
- ChronoScale Announces New Development Partnership to Accelerate AI Compute Capacity Deployment, Supported by a Significant Capital Raise · ChronoScale (GlobeNewswire)
2da5d1f6-5882-43b2-9dd2-6e1c4701b1d2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is STN Odessa Campus?
How much power will STN Odessa Campus use?
Who is building STN Odessa Campus?
Is STN Odessa Campus operating yet?
How verified is the data on STN Odessa Campus?
Deploy Watch
Track STN Odessa Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). STN Odessa Campus: AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/stn-odessa-texas-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/stn-odessa-texas-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/stn-odessa-texas-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP