Data center comparison
Fermi America HyperGrid vs STN Odessa Campus
Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.
Side by side
| Fermi America HyperGrid | STN Odessa Campus | |
|---|---|---|
| Announced capacity | 11 GW | 0.35 GW |
| Energized capacity | 0 GW | not recorded |
| Announced-to-energized gap | 11 GW | 0.35 GW |
| Lifecycle | under construction | announced |
| Developer | Fermi America (Fermi Inc) | STN, Inc. |
| Location | Amarillo, Texas, United States | Odessa, Ector County, Texas, United States |
| Grid | SPP | not recorded |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, Fermi America HyperGrid or STN Odessa Campus?
By announced capacity, Fermi America HyperGrid is larger: 11 GW versus 0.35 GW. Announced figures are claims, not built capacity.
Which is further along, Fermi America HyperGrid or STN Odessa Campus?
Fermi America HyperGrid is under construction; STN Odessa Campus is announced. Energized capacity: 0 GW versus not recorded. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Fermi America HyperGrid and STN Odessa Campus?
Fermi America HyperGrid is in Amarillo, Texas, United States; STN Odessa Campus is in Odessa, Ector County, Texas, United States. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.