DEPLOYDatabase

Data centers by state

Data centers in Texas

77 tracked facilities across 37 operators. Each record carries a sourced operator, location, and status.


Facilities

Ranked by critical IT capacity where disclosed (56 of 77 report a figure). Every row is an individually sourced record.

FacilityOperatorLocationStatusCritical IT
Core Scientific Austin 1Core ScientificAustinoperating-
H5 San AntonioH5 Data CentersSan Antoniooperating-
Prime Data Centers AustinPrime Data CentersAustinoperating-
Prime Data Centers DallasPrime Data CentersDallasoperating-
Oracle Shackelford County AI Data CenterOracleAlbanyunder construction-
Riot CorsicanaRiot PlatformsCorsicanaoperating-
Oracle Abilene AI Data CenterOracleAbileneoperating-
Aligned DFW-01Aligned Data CentersPlanooperating-
TRG DallasTRG DatacentersFarmers Branchoperating-
Aligned DFW-03Aligned Data CentersMansfieldoperating-
Digital Realty DFW29Digital RealtyRichardsonoperating-
Equinix DA1EquinixDallasoperating-
TierPoint Dallas Data CenterTierPointDallasoperating-
Meta Temple Data CenterMetaTempleoperating-
Cologix DAL1CologixDallasoperating-
Meta Fort Worth Data CenterMetaFort Worthoperating-
Cipher Chief FacilityCipher MiningAndrewsoperating-
Cipher Bear FacilityCipher MiningAndrewsoperating-
Provident / PowerHouse Grand Prairie CampusProvident Data CentersGrand Prairieannounced-
Switch Rock CampusSwitchRound Rockunder construction-
Netrality 1301 FanninNetrality Data CentersHoustonoperating-
Microsoft Pecos Datacenter CampusMicrosoftPecosplanned2000 MW
IREN Sweetwater 1IRENSweetwaterunder construction1400 MW
IREN Childress Data CenterIRENChildressoperating750 MW
IREN ChildressIRENChildressoperating750 MW
Riot RockdaleRiot PlatformsRockdaleoperating700 MW
Riot Rockdale FacilityRiot PlatformsRockdaleoperating700 MW
IREN Sweetwater 2IRENSweetwaterunder construction600 MW
Bitdeer Rockdale (Tydeer)Bitdeer TechnologiesRockdaleoperating563 MW
Bitdeer Rockdale Mining DatacenterBitdeerRockdaleoperating563 MW
Aligned Project CaprockAligned Data CentersAbernathyunder construction540 MW
Riot Corsicana FacilityRiot PlatformsCorsicanaoperating400 MW
Hut 8 Beacon PointHut 8Corpus Christiunder construction352 MW
Cipher Barber LakeCipher MiningColorado Cityunder construction300 MW
Soluna Project Dorothy 3Soluna HoldingsSilvertonunder construction300 MW
Cipher Barber Lake SiteCipher MiningColorado Cityplanned300 MW
MARA GranburyMARA HoldingsGranburyoperating300 MW
CleanSpark Sealy CampusCleanSparkSealyplanned300 MW
Cipher Black Pearl FacilityCipher MiningWinkler Countyunder construction300 MW
Cipher Black PearlCipher MiningWinkunder construction300 MW
MARA Granbury FacilityMARA HoldingsGranburyoperating300 MW
CleanSpark Brazoria CampusCleanSparkBrazoriaplanned300 MW
Cipher OdessaCipher MiningOdessaoperating207 MW
Cipher Odessa FacilityCipher MiningOdessaoperating207 MW
Hut 8 Vega Data CenterHut 8Vegaoperating205 MW
Hut 8 VegaHut 8Vegaoperating205 MW
Crusoe Abilene AI Data Center (Lancium Clean Campus)Crusoe EnergyAbileneoperating200 MW
MARA Garden CityMARA HoldingsGarden Cityoperating200 MW
MARA Garden City FacilityMARA HoldingsGarden Cityoperating200 MW
Core Scientific Pecos (Cottonwood)Core ScientificPecosplanned200 MW
QTS Irving 1QTSIrvingoperating165 MW
Galaxy Helios Data Center CampusGalaxy DigitalDickensoperating133 MW
Galaxy Helios Data Center CampusGalaxy DigitalDickens Countyoperating133 MW
Cormint Fort StocktonCormint Data SystemsFort Stocktonoperating130 MW
Skybox Atlantic StationSkybox DatacentersPlanooperating100 MW
Soluna Dorothy Data CenterSolunaSilvertonoperating98 MW
SDC AustinSabey Data CentersRound Rockoperating84 MW
SDC AustinSabey Data CentersAustinoperating84 MW
Soluna Project KatiSoluna HoldingsRaymondvilleoperating83 MW
Cipher ReveilleCipher MiningCotullaplanned70 MW
Element Critical Houston TwoElement CriticalHoustonunder construction60 MW
Aligned DFW-01Aligned Data CentersPlanooperating60 MW
Soluna Project Dorothy 1Soluna HoldingsSilvertonoperating50 MW
Soluna Project Dorothy 2Soluna HoldingsSilvertonoperating48 MW
Stream Dallas DFWA1 (Garland)Stream Data CentersGarlandoperating43 MW
Element Critical Houston OneElement CriticalHoustonoperating40 MW
CyrusOne AUS2-AUS3CyrusOneAustinoperating33 MW
Skybox Austin ISkybox DatacentersAustinoperating30 MW
Skybox Houston OneSkybox DatacentersHoustonoperating26 MW
Core Scientific AustinCore ScientificAustinunder construction20 MW
CyrusOne SAT5-SAT6CyrusOneSan Antoniooperating18 MW
DataBank DFW3DataBankPlanooperating12 MW
T5 @ Dallas IIIT5 Data CentersPlanooperating10.75 MW
Element Critical AustinElement CriticalAustinoperating9.5 MW
DataBank DFW1DataBankDallasoperating7 MW
TRG HOU1TRG DatacentersSpringoperating6 MW
ColoHouse Dallas 1Hivelocity (formerly ColoHouse)Dallasoperating4 MW

Facility-tier records. For campus-scale announced-vs-energized capacity tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.