DEPLOYDatabase

Data center facility

Riot Rockdale

Riot Platforms · Rockdale. Every figure below is individually sourced and dated.


Facility record

operating

Status

crypto hpc

Type

700 MW

Critical IT

2020

Operational

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • capex usd: 89800000 (retrofit for initial deployment) (reported) · source
  • cooling type: immersion and air-cooled (reported) · source
  • critical it mw: 25 MW AMD initial, up to 200 MW critical IT potential; 700 MW gross at interconnection (reported) · source
  • record: Riot Rockdale (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Riot Rockdale?
Riot Rockdale is a data center facility record on the DEPLOY registry, in Rockdale. Every fact on the record is individually sourced and dated.
Who operates Riot Rockdale?
Riot Platforms operates Riot Rockdale, per the sourced record on the DEPLOY registry.
Is Riot Rockdale operating?
Riot Rockdale is recorded as operating on the DEPLOY registry, with 700 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Riot Rockdale?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Riot Rockdale on Deploy.