Crusoe Abilene II AI Factory Campus (Microsoft)

Crusoe · Abilene. Every figure below is individually sourced and dated.


Facility record

under construction

Status

hyperscale

Type

Crusoe

Operator

Abilene

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 900 MW planned (claimed) · source
  • record: Crusoe Abilene II AI Factory Campus (Microsoft) (reported) · source
  • status: under_construction (second dedicated campus, adjacent Lancium land) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Crusoe Abilene II AI Factory Campus (Microsoft)?
Crusoe Abilene II AI Factory Campus (Microsoft) is a data center facility record on the DEPLOY registry, in Abilene. Every fact on the record is individually sourced and dated.
Who operates Crusoe Abilene II AI Factory Campus (Microsoft)?
Crusoe operates Crusoe Abilene II AI Factory Campus (Microsoft), per the sourced record on the DEPLOY registry.
Is Crusoe Abilene II AI Factory Campus (Microsoft) operating?
Crusoe Abilene II AI Factory Campus (Microsoft) is recorded as under construction on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Crusoe Abilene II AI Factory Campus (Microsoft)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Crusoe Abilene II AI Factory Campus (Microsoft) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Crusoe Abilene II AI Factory Campus (Microsoft): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/crusoe-abilene-ii-microsoft-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces