Energy Vault (for Crusoe Cloud) · Snyder. Every figure below is individually sourced and dated.


Facility record

under construction

Status

crypto hpc

Type

Snyder

Location

25 MW

Critical IT

2027

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 8 MW phase 1, expandable to 25 MW (claimed) · source
  • record: Snyder AI Campus (Crusoe Spark) (reported) · source
  • status: under construction; groundbreaking Jul 2026, commercial operation Q1 2027 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Snyder AI Campus (Crusoe Spark)?
Snyder AI Campus (Crusoe Spark) is a data center facility record on the DEPLOY registry, in Snyder. Every fact on the record is individually sourced and dated.
Who operates Snyder AI Campus (Crusoe Spark)?
Energy Vault (for Crusoe Cloud) operates Snyder AI Campus (Crusoe Spark), per the sourced record on the DEPLOY registry.
Is Snyder AI Campus (Crusoe Spark) operating?
Snyder AI Campus (Crusoe Spark) is recorded as under construction on the DEPLOY registry, with 25 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Snyder AI Campus (Crusoe Spark)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Snyder AI Campus (Crusoe Spark) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Snyder AI Campus (Crusoe Spark): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/energy-vault-crusoe-snyder-ai-scurry-county-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces