DEPLOYDatabase

Data center facility

Soluna Project Dorothy 3

Soluna Holdings · Silverton. Every figure below is individually sourced and dated.


Facility record

under construction

Status

crypto hpc

Type

300 MW

Critical IT

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 300 (reported) · source
  • record: Soluna Project Dorothy 3 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Soluna Project Dorothy 3?
Soluna Project Dorothy 3 is a data center facility record on the DEPLOY registry, in Silverton. Every fact on the record is individually sourced and dated.
Who operates Soluna Project Dorothy 3?
Soluna Holdings operates Soluna Project Dorothy 3, per the sourced record on the DEPLOY registry.
Is Soluna Project Dorothy 3 operating?
Soluna Project Dorothy 3 is recorded as under construction on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Soluna Project Dorothy 3?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Soluna Project Dorothy 3 on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.