Facility record

announced

Status

crypto hpc

Type

CleanSpark

Operator

Angleton

Location

300 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 300 MW expandable to 600 MW (claimed) · source
  • record: CleanSpark Brazoria County AI/HPC Campus (reported) · source
  • status: announced; 447-acre powered-land buy near Houston, deal expected to close Q1 2026 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: announced

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is CleanSpark Brazoria County AI/HPC Campus?
CleanSpark Brazoria County AI/HPC Campus is a data center facility record on the DEPLOY registry, in Angleton. Every fact on the record is individually sourced and dated.
Who operates CleanSpark Brazoria County AI/HPC Campus?
CleanSpark operates CleanSpark Brazoria County AI/HPC Campus, per the sourced record on the DEPLOY registry.
Is CleanSpark Brazoria County AI/HPC Campus operating?
CleanSpark Brazoria County AI/HPC Campus is recorded as announced on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on CleanSpark Brazoria County AI/HPC Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track CleanSpark Brazoria County AI/HPC Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). CleanSpark Brazoria County AI/HPC Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/cleanspark-brazoria-county-ai-hpc-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces