Data center facility
Crow Holdings / CleanArc Central Dallas Campus
CleanArc Data Centers (Crow Holdings site) · Dallas. Every figure below is individually sourced and dated.
Facility record
planned
Status
colocation
Type
Location
245 MW
Critical IT
2027
Operational
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Crow Holdings / CleanArc Central Dallas Campus?
Who operates Crow Holdings / CleanArc Central Dallas Campus?
Is Crow Holdings / CleanArc Central Dallas Campus operating?
How verified is the data on Crow Holdings / CleanArc Central Dallas Campus?
Deploy Watch
Track Crow Holdings / CleanArc Central Dallas Campus on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Crow Holdings / CleanArc Central Dallas Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/crow-holdings-cleanarc-dallas-stemmons-campus-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/crow-holdings-cleanarc-dallas-stemmons-campus-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/crow-holdings-cleanarc-dallas-stemmons-campus-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP