Data center facility
Kahla Project
Belltown Power · Marquez. Every figure below is individually sourced and dated.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
- critical it mw: 1500 (reported) · source
- record: Kahla Project (reported) · source
- status: planned - ~900-acre hyperscale data center campus with integrated on-site energy storage/generation proposed by Belltown Power in western Leon County near Marquez, between Houston and Dallas; local opposition organized (reported) · source
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Kahla Project?
Who operates Kahla Project?
Is Kahla Project operating?
How verified is the data on Kahla Project?
Deploy Watch
Track Kahla Project on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Kahla Project: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/kahla-belltown-power-leon-county-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/kahla-belltown-power-leon-county-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/kahla-belltown-power-leon-county-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP