Data center facility
Sangha Renewables West Texas (Ector County)
Sangha Renewables · Ector. Every figure below is individually sourced and dated.
Facility record
operating
Status
crypto hpc
Type
Operator
Location
19.9 MW
Critical IT
2025
Operational
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Aug 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Sangha Renewables West Texas (Ector County)?
Who operates Sangha Renewables West Texas (Ector County)?
Is Sangha Renewables West Texas (Ector County) operating?
How verified is the data on Sangha Renewables West Texas (Ector County)?
Deploy Watch
Track Sangha Renewables West Texas (Ector County) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Sangha Renewables West Texas (Ector County): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/sangha-renewables-ector-county-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/sangha-renewables-ector-county-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/sangha-renewables-ector-county-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP