DEPLOYDatabase

Data center facility

Cipher Barber Lake Site

Cipher Mining · Colorado City. Every figure below is individually sourced and dated.


Facility record

planned

Status

crypto hpc

Type

300 MW

Critical IT

Oncor

Serving utility

On the map

Placed at its city centroid. See it among every tracked data center on the national map.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 300 (verified) · source
  • note: Located near Colorado City; ERCOT interconnection approval up to 300 MW with an energized substation; suitable for HPC or bitcoin mining (verified) · source
  • record: Cipher Barber Lake Site (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Cipher Barber Lake Site?
Cipher Barber Lake Site is a data center facility record on the DEPLOY registry, in Colorado City. Every fact on the record is individually sourced and dated.
Who operates Cipher Barber Lake Site?
Cipher Mining operates Cipher Barber Lake Site, per the sourced record on the DEPLOY registry.
Is Cipher Barber Lake Site operating?
Cipher Barber Lake Site is recorded as planned on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Cipher Barber Lake Site?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Cipher Barber Lake Site on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.