DEPLOYDatabase

Data center campus

Barber Lake

Cipher Digital's (formerly Cipher Mining) 300 gross MW HPC campus on 250 acres near Colorado City in Mitchell County, leased in full to Fluidstack (backstopped by Google). The 10-K frames capacity as 300 gross MW (244 MW Phase I + 56 MW Pha

Under construction · Private land · ERCOT · Colorado City, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
0.30 GW
verified
Under construction
not recorded
Energized
not recorded
Barber Lake capacity claims
Source
Contracted0.30 GW2025-12-31verifiedsec filing
Contracted0.21 GW2025-11-20reportedearnings call

The deal

operator
Cipher Digital Inc. · via subsidiary Cipher Barber Lake LLC; formerly Cipher Mining Inc. (ticker CIFR)
offtaker
Fluidstack USA II Inc. · 10-year HPC lease, full campus
financier
Google LLC · backstops Fluidstack obligations; holds Google Warrants
utility
Luminant / Vistra Operations · interconnection electrical facilities

Power

Power source
grid
Grid operator
ERCOT
Interconnection

Barber Lake substation (Luminant/Vistra interconnection facilities), 0.30 GW grid interconnect, Energized. 300 MW ERCOT interconnection approved without load-profile restriction; substation sold back to Vistra at lease end

Sources

b9d40f4b-f4e6-4690-893f-7951c9c32832 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.