Data center campus
Matrix Data Center Campus (The Matrix Center)
Matrix Data Center Campus is an announced AI data center campus. 0.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · greenfield · Sulphur Springs, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.80 GW | 2026-03-01 | claimed | press release |
| Announced | 3 GW | 2025-06-13 | claimed | press release |
The deal
- developer
- MSB Global Services · Houston-based; direct investment reported ~$140M vs $18B total-community-investment claim.
- chip supplier
- NVIDIA · Marketed as 'optimized for NVIDIA GB300'; no confirmed supply agreement.
Power
- Power source
- mixed
- Interconnection
Bloom Energy fuel-cell microgrid (Phase 1), 0.10 GW gas, Announced. First 100 MW building to run on a natural-gas Bloom fuel-cell microgrid; no TCEQ air permit found.
Sources
- 30 AI data centers to be built at Sulphur Springs campus
- Work Under Way On AI Data Center in Sulphur Springs
- Can MSB Global Actually Pull Off Huge Data Center Project?
0c2fac3e-e47d-416b-802d-98731445f823 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.