Data center facility

Crusoe Abilene AI Data Center (Lancium Clean Campus)

Crusoe · Abilene. Every figure below is individually sourced and dated.


Part of the tracked campus Stargate Abilene.

The story of Crusoe Abilene AI Data Center (Lancium Clean Campus)inherited from campus Stargate Abilene
Announced capex
$15B
Grid
ERCOT · Grid connected, with on-site generation alongside: power comes from a mix of on-site natural gas and grid supply that includes local West Texas wind. As of April 2026 about 0.3 GW was operational against a planned 1.2 GW, so most of the campus is not yet energised.
GPUs
450K 450,000 GB200
Tenant
OpenAI
Land owner
Lancium
Derived
Cost per MW
$13M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(606)

The deal

Inherited from campus Stargate Abilene.

grid operator
ERCOT · Grid-interconnection delays exceeding a year drove the 1.2 GW cap.
tenant
OpenAI · Anchor of the Stargate project.
developer
Oracle · Cloud provider / co-developer.
financier
SoftBank Group · Stargate investment partner.
chip supplier
NVIDIA · Nvidia Blackwell chips.
construction
Crusoe · Built the site.

Financial structure

Inherited from campus Stargate Abilene.

Total JV capital for 1.2 GW Abilene campus
$15B. Crusoe / Blue Owl joint venture; eight buildings journalist report
Phase-2 debt and equity financing (six buildings)
$11.6B. Managed by Blue Owl's Real Assets platform with Primary Digital Infrastructure journalist report
First-phase construction loan
$7.1B. Initial construction loan for the first two buildings journalist report

Investment, workforce and specs

Inherited from campus Stargate Abilene.

GPUs
450,000 GB200 source

Power

Inherited from campus Stargate Abilene. Live grid demand and drought overlay only render on the campus page.

Power source
mixed
Grid operator
ERCOT
Interconnection
Grid connected, with on-site generation alongside: power comes from a mix of on-site natural gas and grid supply that includes local West Texas wind. As of April 2026 about 0.3 GW was operational against a planned 1.2 GW, so most of the campus is not yet energised.
Water
Closed-loop, direct-to-chip water cooling with near-zero evaporation; Abilene's mayor stated the site uses roughly 10 million gallons/year, against the city's 21 to 24 million gallons/day.

On-site behind-the-meter natural gas generation, 0.36 GW gas, Partially energized. ~360 MW across ten simple-cycle turbines (some GE Vernova), permitted for onsite/data-center use only; behind-the-meter while ERCOT interconnection is built. Site went live Sept 2025.

Facility record

operating

Status

hyperscale

Type

Crusoe

Operator

Abilene

Location

200 MW

Critical IT

980,000 sqft

Building

2025

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 200 (reported) · source
  • note: First two buildings (~980,000 sqft) live and supporting 200 MW+ of IT for Oracle/OpenAI; campus expanding to eight buildings and ~1.2 GW (reported) · source
  • record: Crusoe Abilene AI Data Center (Lancium Clean Campus) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Oct 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Crusoe Abilene AI Data Center (Lancium Clean Campus)?
Crusoe Abilene AI Data Center (Lancium Clean Campus) is a data center facility record on the DEPLOY registry, in Abilene. Every fact on the record is individually sourced and dated.
Who operates Crusoe Abilene AI Data Center (Lancium Clean Campus)?
Crusoe operates Crusoe Abilene AI Data Center (Lancium Clean Campus), per the sourced record on the DEPLOY registry.
Is Crusoe Abilene AI Data Center (Lancium Clean Campus) operating?
Crusoe Abilene AI Data Center (Lancium Clean Campus) is recorded as operating on the DEPLOY registry, with 200 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Crusoe Abilene AI Data Center (Lancium Clean Campus)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Crusoe Abilene AI Data Center (Lancium Clean Campus) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Crusoe Abilene AI Data Center (Lancium Clean Campus): data center facility record. Retrieved October 3, 2026, from https://registry.deploy.report/datacenters/facilities/crusoe-abilene-taylor-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces