DEPLOYDatabase

Data center facility

Big Rooter Power Energy & Data Campus

Panamint Capital · Bremond. Every figure below is individually sourced and dated.


Facility record

under construction

Status

hyperscale

Type

Bremond

Location

790 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 790 MW data center within 1.2 GW energy park (claimed) · source
  • record: Big Rooter Power Energy & Data Campus (reported) · source
  • status: under construction; $1.7B multi-use energy + DC campus on former coal mine (Twin Oaks), broke ground July 2026 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Big Rooter Power Energy & Data Campus?
Big Rooter Power Energy & Data Campus is a data center facility record on the DEPLOY registry, in Bremond. Every fact on the record is individually sourced and dated.
Who operates Big Rooter Power Energy & Data Campus?
Panamint Capital operates Big Rooter Power Energy & Data Campus, per the sourced record on the DEPLOY registry.
Is Big Rooter Power Energy & Data Campus operating?
Big Rooter Power Energy & Data Campus is recorded as under construction on the DEPLOY registry, with 790 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Big Rooter Power Energy & Data Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Big Rooter Power Energy & Data Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Big Rooter Power Energy & Data Campus: data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/panamint-big-rooter-power-bremond-robertson-county-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces