DEPLOYDatabase

Data center facility

Texas Critical Data Centers (Permian Basin AI/HPC campus)

Texas Critical Data Centers (New Era Helium / Sharon AI JV) · Odessa. Every figure below is individually sourced and dated.


Facility record

planned

Status

hyperscale

Type

Odessa

Location

250 MW

Critical IT

2026

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 250 MW initial net-zero AI/HPC; master plan scaling beyond 1 GW; ~235-438 acres near Odessa (claimed) · source
  • record: Texas Critical Data Centers (Permian Basin AI/HPC campus) (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Aug 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Texas Critical Data Centers (Permian Basin AI/HPC campus)?
Texas Critical Data Centers (Permian Basin AI/HPC campus) is a data center facility record on the DEPLOY registry, in Odessa. Every fact on the record is individually sourced and dated.
Who operates Texas Critical Data Centers (Permian Basin AI/HPC campus)?
Texas Critical Data Centers (New Era Helium / Sharon AI JV) operates Texas Critical Data Centers (Permian Basin AI/HPC campus), per the sourced record on the DEPLOY registry.
Is Texas Critical Data Centers (Permian Basin AI/HPC campus) operating?
Texas Critical Data Centers (Permian Basin AI/HPC campus) is recorded as planned on the DEPLOY registry, with 250 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Texas Critical Data Centers (Permian Basin AI/HPC campus)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Texas Critical Data Centers (Permian Basin AI/HPC campus) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Texas Critical Data Centers (Permian Basin AI/HPC campus): data center facility record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/facilities/texas-critical-ector-county-odessa-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces