Data center facility
Crusoe Abilene Second Campus
Crusoe · Abilene. Every figure below is individually sourced and dated.
Part of the tracked campus Crusoe Abilene Microsoft AI Factory Campus.
- Cooling
- closed-loop non-evaporative liquid cooling
- Grid
- ERCOT · live in ~10 months
- Tenant
- Microsoft
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(606)
The deal
Inherited from campus Crusoe Abilene Microsoft AI Factory Campus.
Investment, workforce and specs
Inherited from campus Crusoe Abilene Microsoft AI Factory Campus.
- Cooling
- closed-loop non-evaporative liquid cooling source
Power
Inherited from campus Crusoe Abilene Microsoft AI Factory Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- behind the meter gas
- Grid operator
- ERCOT
- Interconnection
- Expected online
- 2027-07-01
- Water
- Crusoe closed-loop non-evaporative liquid cooling systems (company) ([Crusoe](https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure)).
Abilene Microsoft campus behind-the-meter plant, 0.90 GW other, Announced. Crusoe: 900 MW behind-the-meter on-site power plant with MV BESS. Primary release does not name the fuel mix; typed as other.
Abilene Microsoft campus MV BESS, other, Announced. Medium-voltage battery energy storage paired with the on-site plant.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Oct 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Crusoe Abilene Second Campus?
Who operates Crusoe Abilene Second Campus?
Is Crusoe Abilene Second Campus operating?
How verified is the data on Crusoe Abilene Second Campus?
Deploy Watch
Track Crusoe Abilene Second Campus on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Crusoe Abilene Second Campus: data center facility record. Retrieved October 4, 2026, from https://registry.deploy.report/datacenters/facilities/crusoe-abilene-tx-second-campus-900mw
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/crusoe-abilene-tx-second-campus-900mw.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/crusoe-abilene-tx-second-campus-900mw
- Data documentation: /data
- Query this programmatically: Deploy MCP