Nscale is a London-founded neocloud that has rocketed from a 2024 spinout of Norwegian bitcoin-mining group Arkon Energy into one of the most heavily…

Founded
2024
Status
Private

Overview

Nscale is a London-founded neocloud that has rocketed from a 2024 spinout of Norwegian bitcoin-mining group Arkon Energy into one of the most heavily capitalised GPU-cloud operators in Europe. Founded by Josh Payne and Nathan Townsend, it raised roughly $3.7 billion across four rounds in eighteen months, culminating in a March 2026 Series C reported at a $14.6 billion valuation with Nvidia, Nokia, Dell and Aker ASA among its strategic backers. Its distinguishing bet is vertical integration: Nscale owns land, power and buildings on cold, cheap hydro-powered sites in the Nordics (Glomfjord and Narvik in Norway, plus partner capacity in Iceland) while assembling UK and US campuses aimed at sovereign and hyperscale AI workloads.

The company's growth has been driven almost entirely by two anchor contracts. It is supplying roughly 200,000 Nvidia GPUs to Microsoft under a multi-site deal spanning Norway, Texas and Portugal, and it is Nvidia and OpenAI's chosen partner for a UK "Stargate"-style buildout at a former coal plant in Northumberland. Jensen Huang has publicly said Nscale will have around 300,000 GPUs online by the end of 2026, a scale that puts it in the same tier as CoreWeave, Crusoe and Lambda despite its youth.

Nscale positions itself as a full-stack training-and-inference cloud rather than a pure bare-metal seller: managed Slurm and Kubernetes, an inference endpoint product, and a "Radar" fleet-observability API sit on top of the raw H100/H200/B200 supply. Growth has come by acquisition as well as ground-up build, including the Monarch Compute Campus in West Virginia and a reported acquisition of Anyscale to fold in a distributed-training software layer.

Reality check

Contracted business (company-claimed)

Aug 2026 S-1: $103.4B of active and contracted value; about 461,000 GPUs and 1.37 GW, on contracts averaging about 5.7 years.

Anthropic agreements (company-claimed)

Aug 2026 S-1: GPU agreements worth up to about $44.6B for Vera Rubin capacity at Monarch Compute Campus; financing not yet committed.

ByteDance revenue share (company-claimed)

A ByteDance unit was about 73% of 2025 revenue (~$24M of $33M), on 2,304 B200 GPUs in Glomfjord, Norway.

Build commitments (company-claimed)

Jun 2026 S-1: $24.0B of equipment and $3.5B of construction commitments, plus $1.4B of leases not yet started.

Deployments (company-claimed)

Oct 2026: 50,000+ GPUs across six data centers in five countries. Ward County, Texas went live, leasing 234 MW from Ionic Digital.

Loughton grid delay (company-claimed)

The planned 90 MW Loughton, Essex site may not get a grid connection until the early-to-mid 2030s, versus a 2027 target.

New COO (company-claimed)

Justin Osofsky, 18 years at Meta (most recently Chief Partnerships Officer), joined as COO.

Verified record

Verified deployments
None on file
Active incidents
None on file

Key facts

Origin

Founded May 2024 in London by Josh Payne and Nathan Townsend, spun out of Arkon Energy.

Funding before IPO

About $3.7B across four rounds: $155M Series A, $1.1B Series B, a $433M SAFE and a $2B Series C (March 2026); plus a $900M credit facility.

Valuation (Mar 2026)

$14.6B at the Series C, with NVIDIA, Nokia, Dell and Aker as strategic investors.

Pre-IPO notes (company-stated, Sep 2026)

$3.36B led by Third Point with NVIDIA, Apollo funds, Citadel and others, converting to shares at IPO; NVIDIA adds $1B in November.

IPO filing (Sep 2026)

Filed an S-1 for a NYSE listing as NSCL. H1 2026 revenue of $140.6M and a net loss of about $1.02B.

Microsoft contract

About 200,000 NVIDIA GB300 GPUs for Microsoft across Norway, Texas and Portugal, phased over 2026 and 2027.

Sites

Operated: Glomfjord and Narvik (Norway), Ward County (Texas), Monarch Compute Campus (West Virginia). Partner sites in Portugal, Iceland, Norway, the UK and North Carolina.

UK projects

A buildout with OpenAI and NVIDIA at a former Northumberland coal plant, and 14 MW across three BT sites.

Acquisitions

Monarch Compute Campus (West Virginia) and Anyscale, agreed July 2026 for $1.65B in Nscale equity.

Hardware and design

NVIDIA GB300, GB200 and H100 plus AMD MI300X, in liquid-cooled modular halls targeting a PUE of 1.10-1.15.

IPO target (reported, Sep 2026)

Seeking to raise up to $3B in the NYSE IPO at a valuation of up to $35B, per Bloomberg.

Capacity built (reported, Oct 2026)

Bloomberg: IPO filings show under 1% of targeted gigawatt capacity built through August 2026.

Glomfjord delays (reported, Oct 2026)

Bloomberg: the ByteDance build is about six months late after cooling leaks and a December transformer fire; 6.4 MW of a planned 30 MW is running.

Glomfjord safety inspection (reported)

Norway's DSB found 10 deviations at Glomfjord, including ungrounded high-voltage parts (report dated May 18, 2026). Bloomberg says the case closed in September after fixes.

Microsoft exits Loughton (reported, Oct 2026)

The Telegraph, Guardian and FT reported on Oct 18 2026 that Microsoft ended its deal to anchor the Loughton, Essex site after grid power slipped to the 2030s.

Loughton response (company-stated, Oct 2026)

Nscale says it remains committed to Loughton, is exploring other power sources and UK sites, and that the Microsoft relationship and its other contracts are unaffected.

IPO valuation pushback (reported, Oct 2026)

Bloomberg: Nscale has sought about a $30B IPO valuation while some investors urge $16B to $19B. Marketing is to start once SEC comments are resolved; plans may change.

Second Anthropic deal talks (reported, Oct 2026)

Bloomberg: in talks on a second deal worth about $45B for a second Monarch building, about 460 MW on Vera Rubin. Anthropic has first refusal on a third. Not final.

DSX MaxLPS test (company-run, Oct 2026)

On four GB300 NVL72 racks in Iceland, NVIDIA DSX MaxLPS gave 49% higher inference throughput and 37% more managed GPU capacity within the same 264 kW power budget.

IPO pushed back (reported, Oct 2026)

Reuters reported Nscale pushed its IPO plans to later in 2026 amid higher rates and an AI infrastructure selloff, partly to address SEC staff comments on its filing.

Anthropic S-1 terms (counterparty filing, Oct 2026)

Anthropic's S-1: up to about $44.6B into 2033, with fees only as capacity is delivered and accepted. Nscale must use best efforts to line up financing for the GPUs and sites.

Nvidia credit support talks (reported, Oct 2026)

The Information: Nvidia is in talks to give Nscale billions of dollars in credit guarantees to back debt for its West Virginia campus Anthropic plans to use. Not signed; terms may change.

Bond market access (reported, Oct 2026)

WSJ, citing people familiar, said on Oct 31 that CoreWeave, Nebius and Nscale have effectively been shut out of the bond market in recent weeks as lenders and investors demand tougher terms.

Microsoft declined Texas expansion option (reported)

Microsoft declined an option for about 500MW of additional capacity at Nscale's own site in Ward County, Texas, according to the Financial Times.

First NVIDIA Vera Rubin NVL72 systems online (company-stated)

On 18 November 2026 Nscale said it had brought online its first NVIDIA Vera Rubin NVL72 systems, built on Dell PowerEdge XE9812 servers, as the start of a global rollout expected in the coming months. It did not say which site hosts them.

Data & sources

Company filings

2

Press releases

1

News coverage

7

Web sources

45

55 sources backing this record.View all →

Partnerships

Every company Nscale has built with, alongside the ones only announced in a press release.

3 total1 operating1 just announced

Most-frequent partners

  1. 1Anthropic1× joint4 total
  2. 2AWS1× joint30 total
  3. 3Nokia1× joint1 total
  4. 4Skeleton1× joint
  5. 5Telia1× joint
  6. 6Verda1× joint

Relationships

Current leadership (7)

Founders (1)

See all founders across the registry →

Safety record

No incidents on record for Nscale.

Only active incidents are counted. Retracted incidents are excluded from this summary but remain reachable at their canonical URLs.

Full safety record: incidents, sourcing, and exposure data →

Nscale on the data-center map

Every verified data center Nscale operates that has a mapped coordinate (10 total). Filled circles are Tier-2 facilities and Tier-1 campuses under this operator; click any pin to open its record.

Nscale data centers (13)

AI data centers Nscale operates or is a party to, from the DEPLOY data center registry.

Recent coverage

Nscale in third-party press

Mentioned on (7)

Registry pages whose text names Nscale.

Appears in DEPLOY reports