Data center campus

Stargate Norway (Kvandal / Narvik)

Stargate Norway is an announced AI data center campus. 0.23 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · Narvik, Nordland, Norway


Capacity: announced vs energized

Announced
0.23 GW
reported
Contracted
not recorded
Under construction
0.02 GW
reported
Energized
0 GW
reported

Announced-to-energized gap: 0.23 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Stargate Norway (Kvandal / Narvik) capacity claims
Source
Announced0.23 GW2025-07-31reportedpress release
Announced0.29 GW2025-07-31claimedpress release
Energized0 GW2025-07-31reportedpress release
Under construction0.02 GW2025-07-31reportedpress release

The deal

developer
Nscale · Designs and builds the facility; 50% co-owner via wholly owned subsidiary
financier
Aker ASA · 50% co-owner; industrial partner
offtaker
OpenAI · Initial offtaker with option to scale under OpenAI for Countries
chip supplier
NVIDIA · GPU supplier (100,000 GPUs targeted)

Power

Power source
grid
Interconnection

Regional surplus hydropower supply, grid interconnect, Announced. Facility to run entirely on renewable hydropower; specific dedicated project capacity not disclosed

Financial structure

Equity in initial phase (100% basis, split equally)
$250M. Upwards of USD 250M; each partner contributes equally press release
Committed to initial 20MW phase (both partners)
$1B. Initial 20MW phase only press release

Sources

30c92b75-7001-4e3c-b579-91a4de785cd9 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.