DEPLOYDatabase

Data center campus

Nscale Barstow AI Data Center (Microsoft)

Nscale Barstow AI Data Center is an AI data center campus developed by Nscale in Texas, Barstow. 0.70 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Nscale · ERCOT · Barstow, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.70 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: Q3 2026. 1 month away. Claimed by Nscale (reported) (source).

Nscale Barstow AI Data Center (Microsoft) capacity claims
Source
Announced1.20 GW2026-06-01claimedjournalist report
Announced0.70 GW2025-10-01reportedcompany filing
Contracted0.24 GW2026-06-01reportedjournalist report

Key facts

0.70 GW

Announced

0 GW

Energized

Nscale

Developer

ERCOT

Grid

0.70 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Nscale Barstow AI Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
Nscale · AI infrastructure operator leasing the site
tenant
Microsoft · Offtaker of Nvidia AI capacity
land owner
Ionic Digital · Owner of the Barstow site leased to Nscale
chip supplier
NVIDIA · GB300 GPUs

Power

Power source
grid
Grid operator
ERCOT
Interconnection

The Texas (ERCOT) grid demand right now: 72.1 GW (EIA-930, 2026-08-20 05:00). Nscale Barstow AI Data Center's announced 0.70 GW would be 1.0% of the grid's current load.

County water status: No drought in Ward County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Nscale Barstow AI Data Center is in Texas, Barstow. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Nscale-Microsoft AI compute contract (up to)
up to $14B. Contract value stated up to ~$14B; not campus construction cost journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Investment, workforce and specs

Estimated compute: the claimed Approximately 104,000 NVIDIA GB300 GPUs at the Texas campus chips are on the order of 90x the compute used to train a GPT-4-class model. Derived from the chip-count claim, not measured (basis).

Timeline

  1. Aug 2026
    party added
    chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825
  2. Aug 2026
    Current: Under construction

Sources

8816a42d-177f-434d-9475-db84f39e535c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Nscale Barstow AI Data Center (Microsoft)?
Nscale Barstow AI Data Center (Microsoft) is an AI data center campus tracked on the DEPLOY registry, located in Barstow. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Nscale Barstow AI Data Center (Microsoft) use?
Nscale Barstow AI Data Center (Microsoft) has 0.70 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Nscale Barstow AI Data Center (Microsoft)?
Nscale is recorded as a party to Nscale Barstow AI Data Center (Microsoft) on the DEPLOY registry.
Is Nscale Barstow AI Data Center (Microsoft) operating yet?
As of the most recent verification on the DEPLOY registry, Nscale Barstow AI Data Center (Microsoft) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Nscale Barstow AI Data Center (Microsoft)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Nscale Barstow AI Data Center (Microsoft) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Nscale Barstow AI Data Center (Microsoft): AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/nscale-barstow-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces