Narvik is a tracked AI data center campus in Nordland, Narvik. Listed as an nscale-operated site on the company's data-centers page. No MW disclosed publicly.

Energized · Nscale · Narvik, Nordland, Norway


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Narvik capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Nscale

Developer

Norway

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Kvandal 230 MW / 100k GPU plan (primary Nscale)
Nscale's Jul 31 2025 Stargate Norway announcement with Aker and OpenAI places the facility in Kvandal just outside Narvik, Northern Norway, plans 230 MW of capacity with ambitions to expand by an additional 290 MW, and targets delivery of 100,000 NVIDIA GPUs by the end of 2026 on entirely renewable power. Frame MW and GPU counts as developer-stated plans, not energized capacity (Nscale, Jul 31 2025)
Nscale-Aker JV / initial 20 MW funding (primary Nscale)
The same Nscale release says the site will be owned by a 50/50 joint venture between Nscale and Aker (subject to closing conditions), with both parties committing approximately USD 1 billion to the initial 20 MW phase including upwards of USD 250 million in equity on a 100% basis. It also describes closed-loop direct-to-chip liquid cooling and making excess heat available to regional low-carbon enterprises. Treat JV, funding, and cooling claims as announcement terms (Nscale, Jul 31 2025)
Microsoft offtake / OpenAI exit (reported DCD)
Data Center Dynamics reported (Apr 15 2026) that Microsoft and Nscale expanded their partnership with a further 30,000 Nvidia Rubin GPUs for the 230 MW Kvandal campus outside Narvik, with that additional compute to be delivered in 2027, after OpenAI dropped out of the Stargate Norway offtake following a failure to conclude an agreement (citing Bloomberg). DCD also notes Microsoft already had a related agreement for $6.2 billion of capacity signed in Sep 2025. Frame as press-reported offtake shift, not a completed energization (DCD, Apr 15 2026)

On the data center map

Every tracked data center is on this map, centered on Narvik. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNordland(3)

The deal

developer
Nscale

Power

Power source
grid
Interconnection

Why here

Narvik is in Nordland, Narvik. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Sources

3c4b7752-47dc-4cc1-83bd-639b112bbdbc · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Narvik?
Narvik is an AI data center campus tracked on the DEPLOY registry, located in Narvik. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Narvik?
Nscale is recorded as a party to Narvik on the DEPLOY registry. The full party list, with each role, is on the record.
Is Narvik operating yet?
As of the most recent verification on the DEPLOY registry, Narvik is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Narvik?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Narvik on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Narvik: AI data center campus record. Retrieved October 11, 2026, from https://registry.deploy.report/datacenters/nscale-narvik

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces