DEPLOYDatabase

Data center campus

Loughton II

Loughton II is a tracked AI data center campus in Essex, Loughton. Planned follow-on to the first Loughton campus.

Announced · Nscale · Loughton, Essex, United Kingdom


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Loughton II capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Nscale

Developer

On the data center map

Every tracked data center is on this map, centered on Loughton II. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterEssex(3)

The deal

developer
Nscale

Why here

Loughton II is in Essex, Loughton. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

UK Maritime Autonomous Surface Ships (MASS) Code Publicationstandard · 2026-07-01 · United Kingdom
UK Self-Driving Liability and Licensing Regimestandard · 2026-01-01 · United Kingdom

Sources

9d6b6d28-a78e-47d9-bfce-7e2ef744cac6 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Loughton II?
Loughton II is an AI data center campus tracked on the DEPLOY registry, located in Loughton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Loughton II?
Nscale is recorded as a party to Loughton II on the DEPLOY registry. The full party list, with each role, is on the record.
Is Loughton II operating yet?
As of the most recent verification on the DEPLOY registry, Loughton II is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Loughton II?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Loughton II on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Loughton II: AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/nscale-loughton-ii

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces