Monarch Compute Campus

Monarch Compute Campus is a tracked AI data center campus in West Virginia, Mingo. Acquired by nscale for US expansion per Wikipedia. Site is listed as coming online on the nscale data-centers page.

Announced · Nscale · Wharncliffe, Mingo, West Virginia, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded

Expected online: second half of 2027 (first phase). 13 months away..The expected date has moved 1 time: first half of 2028, then second half of 2027.

Monarch Compute Campus capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Nscale

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Campus (company-claimed)
2,250+ acres in Mason County, WV; Phase 1 1.35 GW by early 2028; path to 8 GW+
Power (company-claimed)
First state-certified AI microgrid; all power on site; closed-loop cooling
Acquisition (reported, Mar 2026)
Nscale buying AIPCorp; Microsoft LOI for 1.35 GW on Vera Rubin GPUs
Second building talks (reported, Oct 2026)
Bloomberg: Nscale is in talks to supply Anthropic from a second Monarch building, about 460 MW on Vera Rubin, for about $45B. Anthropic has first refusal on a third.

On the data center map

Every tracked data center is on this map, centered on Monarch Compute Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Monarch Compute Campus
Grid
live in ~10 months

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterMingo(5)·West Virginia(17)

The deal

developer
Nscale

Power

Interconnection

County water status: No drought in Mingo County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Monarch Compute Campus is in West Virginia, Mingo. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 2 permits on file with WVDEP DAQ and WVDEP: 1 air permit (1 pending), 1 stormwater authorization.

Stormwater construction general permit registration WVR113311Monarch Cloud Campus, LLCWVDEP · Status not shown

Timeline

  1. Nov 2026
    energization date changed
    intake proposal 566b8b42-7660-4320-9462-53b29c9e6f69
  2. Nov 2026
    Current: Announced

Sources

3bee5e2d-5a19-429a-aa8a-f7c0def619f5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Monarch Compute Campus?
Monarch Compute Campus is an AI data center campus tracked on the DEPLOY registry, located in Wharncliffe. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Monarch Compute Campus?
Nscale is recorded as a party to Monarch Compute Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Monarch Compute Campus operating yet?
As of the most recent verification on the DEPLOY registry, Monarch Compute Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Monarch Compute Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Monarch Compute Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Monarch Compute Campus: AI data center campus record. Retrieved November 26, 2026, from https://registry.deploy.report/datacenters/nscale-monarch-compute-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces