Data center campus
Monarch Compute Campus
Monarch Compute Campus is a tracked AI data center campus in West Virginia, Mingo. Acquired by nscale for US expansion per Wikipedia. Site is listed as coming online on the nscale data-centers page.
Announced · Nscale · Wharncliffe, Mingo, West Virginia, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Mason County scale / Phase 1 framing (primary Nscale)
- Nscale's Monarch page places the campus in Mason County, West Virginia on more than 2,250 acres, describes Phase 1 as engineered to host 1.35 GW of AI computing capacity with delivery targeted by early 2028, and states a multi-phase expansion path to 8 GW+ with more than $20 billion in planned capital investment. Frame GW and dollar figures as developer-stated plans, not energized capacity (Nscale Monarch)
- On-site AI microgrid / closed-loop cooling (primary Nscale)
- Nscale says Monarch is the first-ever state-certified Artificial Intelligence (AI) Microgrid in the United States, developed with NVIDIA and Caterpillar, generates all of its own power on-site independent of the public grid, and cools with closed-loop systems that do not use municipal drinking water. Treat microgrid certification and water claims as operator statements (Nscale Monarch)
- AIPCorp acquisition / Microsoft LOI (reported DCD)
- Data Center Dynamics reported (Mar 17 2026) that Nscale agreed to acquire American Intelligence & Power Corporation including the up to 8 GW Monarch campus, and signed a letter of intent with Microsoft for 1.35 GW of AI compute on Nvidia Vera Rubin NVL72 GPUs in multiple tranches beginning late 2027. DCD notes LOIs are generally not legally binding. The same report says first-phase power of 2 GW is expected online by 2028 with Caterpillar G3500 gas gen-sets. Frame as reported deal and LOI terms, not a completed offtake (DCD, Mar 17 2026)
On the data center map
Every tracked data center is on this map, centered on Monarch Compute Campus. Pan or zoom out to see how close rivals are building.
In clusterMingo(5)·West Virginia(17)
The deal
- developer
- Nscale
Power
- Interconnection
County water status: No drought in Mingo County, week of 2026-10-06 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Monarch Compute Campus is in West Virginia, Mingo. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Monarch Compute Campus — nscale facility
- Monarch Compute Campus West Virginia
- Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute
3bee5e2d-5a19-429a-aa8a-f7c0def619f5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Monarch Compute Campus?
Who is building Monarch Compute Campus?
Is Monarch Compute Campus operating yet?
How verified is the data on Monarch Compute Campus?
Deploy Watch
Track Monarch Compute Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Monarch Compute Campus: AI data center campus record. Retrieved October 11, 2026, from https://registry.deploy.report/datacenters/nscale-monarch-compute-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nscale-monarch-compute-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nscale-monarch-compute-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP