BT-owned UK sites (3 sites, up to 14 MW total)

BT-owned UK sites is a tracked AI data center campus in Multiple, Global. April 2026 partnership: nscale to build up to 14 MW of AI DC infrastructure across three existing BT-owned UK sites. Specific site names not yet public.

Announced · Nscale · Multiple, Global


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
BT-owned UK sites (3 sites, up to 14 MW total) capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Nscale

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
14 MW (Announced total across the three BT sites (April 2026 partnership).)
Named tenants
BT

On the data center map

No mappable coordinate is recorded for BT-owned UK sites (3 sites, up to 14 MW total) yet. Location: Multiple, Global.

The deal

developer
Nscale

Why here

BT-owned UK sites is in Multiple, Global. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

06474a7b-2e67-453f-991b-0ae6517a9dc3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is BT-owned UK sites (3 sites, up to 14 MW total)?
BT-owned UK sites (3 sites, up to 14 MW total) is an AI data center campus tracked on the DEPLOY registry, located in Multiple, Global. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building BT-owned UK sites (3 sites, up to 14 MW total)?
Nscale is recorded as a party to BT-owned UK sites (3 sites, up to 14 MW total) on the DEPLOY registry. The full party list, with each role, is on the record.
Is BT-owned UK sites (3 sites, up to 14 MW total) operating yet?
As of the most recent verification on the DEPLOY registry, BT-owned UK sites (3 sites, up to 14 MW total) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on BT-owned UK sites (3 sites, up to 14 MW total)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track BT-owned UK sites (3 sites, up to 14 MW total) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). BT-owned UK sites (3 sites, up to 14 MW total): AI data center campus record. Retrieved August 28, 2026, from https://registry.deploy.report/datacenters/nscale-bt-owned-uk-sites

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces