Microsoft La Porte Data Center Campus is an AI data center campus developed by Microsoft in Indiana, La Porte. 0.54 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Microsoft · Private land · MISO · La Porte, Indiana, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.54 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2029. 40 months away. Claimed by Microsoft (reported) (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.54 GW | 2026-06-01 | claimed | tracker |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Microsoft La Porte Data Center Campus. Pan or zoom out to see how close rivals are building.
The deal
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
The MISO grid demand right now: 89.4 GW (EIA-930, 2026-08-20 04:00). Microsoft La Porte Data Center Campus's announced 0.54 GW would be 0.6% of the grid's current load.
County water status: No drought in LaPorte County, week of 2026-08-11 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Microsoft La Porte Data Center Campus sits on private land in Indiana, La Porte. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Microsoft La Porte data center investment
- $1B. Initial announcement; campus later expanded via ~1,000-acre annexation press release
- Announced investment
- $1B. Initial announced ~$1 billion, 245,000 sq ft data center on 489 acres in Radius Industrial Park press release
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Permanent jobs
- Approximately 200 jobs by end of 2032 source
Timeline
- Aug 2026party addedutility: NIPSCO (Northern Indiana Public Service Company)
- Aug 2026Current: Under construction
Sources
- DCD: Microsoft expands La Porte, Indiana campus
- City of La Porte: $1B Microsoft data center announced
- Indiana IEDC: Microsoft $1B La Porte announcement
2b763953-2d67-48e5-a533-3ffdc5148bc8 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Microsoft La Porte Data Center Campus?
How much power will Microsoft La Porte Data Center Campus use?
Who is building Microsoft La Porte Data Center Campus?
Is Microsoft La Porte Data Center Campus operating yet?
How verified is the data on Microsoft La Porte Data Center Campus?
Deploy Watch
Track Microsoft La Porte Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Microsoft La Porte Data Center Campus: AI data center campus record. Retrieved August 20, 2026, from https://registry.deploy.report/datacenters/microsoft-laporte-indiana
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/microsoft-laporte-indiana.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/microsoft-laporte-indiana
- Data documentation: /data
- Query this programmatically: Deploy MCP