Microsoft Fairwater Data Center (Mount Pleasant)

Microsoft Fairwater Data Center is an AI data center campus developed by Microsoft in Wisconsin, Mount Pleasant. 0.45 GW of capacity has been announced; 0.37 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Microsoft · Former industrial site · MISO · Mount Pleasant, Wisconsin, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.08 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Expected online: 2028 (next phase). 25 months away..

Microsoft Fairwater Data Center (Mount Pleasant) capacity claims
Source
Announced0.45 GW2025-01-01reportedutility filing
Energized0.37 GW2026-04-16reportedjournalist report
Under construction2.26 GW2028-05-13claimedjournalist report

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

Delivery paceAnnounced Q1 2025 · live Q2 2026 · 1 yr 4 mo build

2018-05-16Contains modified Copernicus Sentinel data 2018
2020-05-20Contains modified Copernicus Sentinel data 2020
2022-07-14Contains modified Copernicus Sentinel data 2022
2025-09-16Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; 3 on record.

Building 4
Building sqft: 300,572
polygon on record (9 vertices)
DC Building 3
Building sqft: 287,286
polygon on record (5 vertices)
Building 5
Building sqft: 112,058
polygon on record (5 vertices)

Manifest totals: 699,916 sqft. Rolled from the per-building rows above.

Key facts

0.45 GW

Announced

0.37 GW

Energized

Microsoft

Developer

MISO

Grid

5

Facilities tracked

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Operator
Microsoft
Campus (company-claimed)
About 315 acres in Mount Pleasant, WI; three buildings, about 1.2M sq ft
First facility (company-claimed, Jun 2026)
Completed and fully operational as of Jun 23 2026
Second facility (targeted)
Under construction; completion 2028
AI hardware (company-claimed)
Single flat-networked NVIDIA GB200 supercomputer
Cooling (company-claimed)
Closed-loop liquid cooling; water filled once and recirculated
Jobs (company-claimed)
About 550 employees now, about 800 later; $4.7B WI construction spend 2024-2028
IT capacity
Not disclosed by Microsoft

On the data center map

Every tracked data center is on this map, centered on Microsoft Fairwater Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Microsoft Fairwater Data Center (Mount Pleasant)
Announced capex
$3.3B
Grid
MISO · live in ~17 months
Tenant
Microsoft / OpenAI
Derived
Cost per MW
$7M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterWisconsin(43)

The deal

tenant
Microsoft / OpenAI · Self-tenant AI supercompute (Azure).
chip supplier
NVIDIA · GB200/B200-class GPUs (Epoch cites B200).
utility
We Energies · Regulated monopoly; sole grid power supplier, building new gas generation.
grid operator
MISO · We Energies operates within MISO.
developer
Microsoft · Owner-operator; Fairwater flagship AI datacenter on former Foxconn land.

Power

Power source
grid
Grid operator
MISO
Interconnection
Water
Closed-loop liquid cooling filled once at construction with no ongoing water draw and no evaporation across about 90% of capacity; the remaining ~10% uses outdoor-air cooling and taps water only during peak summer heat. Microsoft compares annual water use to a single restaurant.

We Energies Oak Creek gas plant (5 simple-cycle turbines), 1.10 GW gas, Permitted. 1,100 MW proposed at the Oak Creek coal site; first turbine delivery May 2026, operations winter 2027-summer 2028.

We Energies Paris gas plant (Kenosha County), 0.13 GW gas, Permitted. 128 MW gas plant near Paris, WI; part of ~$2.77B of PSC-approved generation/transmission justified on Microsoft load.

The MISO grid demand right now: 75.4 GW (EIA-930, 2026-11-19 16:00). Microsoft Fairwater Data Center's announced 0.45 GW would be 0.6% of the grid's current load.

County water status: No drought in Racine County, week of 2026-11-10 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to Microsoft Fairwater Data Center (Mount Pleasant) on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. Blackwell-generation AI datacenter (Fairwater flagship); Microsoft's next-generation closed-loop cooled AI DC design

    reported

    Microsoft

Why here

Microsoft Fairwater Data Center sits on former industrial site in Wisconsin, Mount Pleasant. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Microsoft Mount Pleasant campus investment (announced)
$3.3B. Initial announced investment; Epoch estimates ~$14B deployed to date and ~$85B at full buildout. press release

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document. 7 permits on file with WDNR: 7 air permits (2 pending).

Air construction permit (minor source) 26-MIN-096Filed 2026-10-23 · Microsoft Mount Pleasant Data Centers (FID 252302490)WDNR · Pending
FESOP operation permit revision 25230249A-F06Filed 2026-08-18 · Microsoft Mount Pleasant Data Centers (FID 252302490)WDNR · Pending
Air construction permit (minor source) 25-MIN-113Filed 2025-11-11 · decided 2026-06-12 · Microsoft Mount Pleasant Data Centers (FID 252302490)WDNR · In effect

Facilities at this campus

Timeline

  1. Nov 2026
    air facility recorded
    EPA's Clean Air Act records list MICROSOFT CORPORATION - MKE 3B DATA CENTER (4800 90th St, Mount Pleasant, WI) as operating, a synthetic minor source permitted at 80% or more of the major-source threshold. Its most recent Clean Air Act violation on file is dated July 31, 2025. Source: EPA ECHO facility WI0000005510130249.
  2. Nov 2026
    Current: Partially energized

Sources

824d3b90-2903-4335-9716-8f73fb969f7a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Microsoft Fairwater Data Center (Mount Pleasant)?
Microsoft Fairwater Data Center (Mount Pleasant) is an AI data center campus tracked on the DEPLOY registry, located in Mount Pleasant. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Microsoft Fairwater Data Center (Mount Pleasant) use?
Microsoft Fairwater Data Center (Mount Pleasant) has 0.45 GW of announced capacity on the DEPLOY registry, of which 0.37 GW is recorded as energized, an announced-to-energized gap of 0.08 GW. Each figure is individually dated and sourced.
Who is building Microsoft Fairwater Data Center (Mount Pleasant)?
Microsoft is recorded as a party to Microsoft Fairwater Data Center (Mount Pleasant) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Microsoft Fairwater Data Center (Mount Pleasant) operating yet?
As of the most recent verification on the DEPLOY registry, Microsoft Fairwater Data Center (Mount Pleasant) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Microsoft Fairwater Data Center (Mount Pleasant)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Microsoft Fairwater Data Center (Mount Pleasant) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Microsoft Fairwater Data Center (Mount Pleasant): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/microsoft-fairwater-wisconsin

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces