Data center campus
Microsoft Fairwater Atlanta / QTS Fayetteville Campus
Microsoft Fairwater Atlanta / QTS Fayetteville Campus is an announced AI data center campus. 1.50 GW of capacity has been announced; 0.34 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · greenfield · Fayetteville, Georgia, United States
Capacity: announced vs energized
Announced
1.50 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
0.34 GW
reported
Announced-to-energized gap: 1.16 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.50 GW | 2025-01-01 | reported | utility filing |
| Energized | 0.34 GW | 2025-10-01 | reported | journalist report |
The deal
- operator
- Microsoft · Fairwater buildings
- developer
- QTS Data Centers · campus developer, Blackstone-owned
- utility
- Georgia Power / Southern Company · Ashley Park 500/230-kV substation
Power
- Power source
- grid
- Interconnection
Sources
- Microsoft Fairwater Atlanta: A Grid-Only Gigawatt AI Data Center
- QTS Plans World's Largest Data Center Campus in Fayetteville
ee24a4c1-dad9-4591-8bc2-dadbd2f88ba7 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.