Grid operator
AI data centers on the MISO grid
Every tracked AI data center campus interconnecting to the MISO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
12
Announced (combined)
11.49 GW
Energized (combined)
0.47 GW
Grid demand now
83.7 GW
The MISO grid is pulling 83.7 GW right now (EIA-930, 2026-08-20 06:00). If every announced campus on this grid energized fully, their combined 11.49 GW would be 13.7% of the grid's current load. Announced numbers are claims, not built capacity; see the methodology.
Campuses on this grid
| Meta Hyperion Data Center | Delhi | under construction | 5 | 0 |
| Polaris Forge 1 | Ellendale | partially energized | 1 | 0.10 |
| Google / DTE 'Project Cannoli' — Van Buren Township | Van Buren Township | permitted | 1 | — |
| Meta Lebanon Data Center | Lebanon | under construction | 1 | — |
| Stargate Saline Township | Saline Township | under construction | 1 | 0 |
| Vantage Port Washington (Lighthouse) Campus | Port Washington | under construction | 0.90 | — |
| Microsoft La Porte Data Center Campus | La Porte | under construction | 0.54 | — |
| Microsoft Fairwater Data Center | Mount Pleasant | partially energized | 0.45 | 0.37 |
| Polaris Forge 2 | Harwood | under construction | 0.28 | — |
| Meta Beaver Dam Data Center | Beaver Dam | under construction | 0.22 | — |
| University of Michigan / Los Alamos National Lab Computing Facility | Ypsilanti Township | announced | 0.10 | — |
| AWS Madison County Data Center Campuses | Canton | under construction | — | — |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.