Data center campus
University of Michigan / Los Alamos National Lab Computing Facility
University of Michigan / Los Alamos National Lab Computing Facility is an AI data center campus developed by University of Michigan in Michigan, Ypsilanti Township. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · University of Michigan · greenfield · MISO · Ypsilanti Township, Michigan, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2030. 51 months away. Claimed by University of Michigan (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2026-08-01 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
University of Michigan
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Textile Road site selection / ~$1.2B (reported MLive)
- MLive reported (Aug 11 2026) that the University of Michigan selected about 144 acres off Textile Road in Ypsilanti Township (near the Ford Rawsonville plant) as the preferred site for a roughly $1.2 billion joint computing facility with DOE's Los Alamos National Laboratory, after evaluating Willow Run / ACM alternatives. UM said it purchased 124 acres in March plus a prior ~20-acre parcel (MLive, Aug 11 2026)
- Building program / jobs / $100M SSRP (reported MLive)
- The same MLive report states the Michigan Strategic Fund is supporting the project with a $100 million Strategic Site Readiness Program grant, and that construction is expected to create about 300 union jobs with more than 200 permanent research positions and dozens of technical roles once complete. Local township opposition and a planned Sept 9 town hall are also noted (MLive, Aug 11 2026)
- 50-100 MW / facility split / financing (reported MITechNews)
- MITechNews reported (Aug 14 2026) that U-M says the center would begin near 50 MW and could eventually reach 100 MW, with a dedicated DTE substation paid by the university; the program includes about 240,000 sq ft federal research space (including classified work) plus about 50,000 sq ft academic space. Financing is described as $300M from Los Alamos, $220M from U-M, $630M U-M-facilitated financing, and $100M state SSRP. Frame MW and square footage as U-M claims reported by MITechNews (MITechNews, Aug 14 2026)
On the data center map
Every tracked data center is on this map, centered on University of Michigan / Los Alamos National Lab Computing Facility. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $1.3B
- Cost per MW
- $13M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterMichigan(59)
The deal
- operator
- University of Michigan · site owner
- operator
- Los Alamos National Laboratory · DOE partner
- financier
- State of Michigan · $100M Strategic Site Readiness Program grant for site development/construction
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
The MISO grid demand right now: 91.6 GW (EIA-930, 2026-10-02 01:00). University of Michigan / Los Alamos National Lab Computing Facility's announced 0.10 GW would be 0.1% of the grid's current load.
County water status: Moderate drought (D1) in Wayne County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
University of Michigan / Los Alamos National Lab Computing Facility sits on greenfield in Michigan, Ypsilanti Township. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Computing facility total investment
- $1.3B journalist report
- Strategic Site Readiness Program grant
- $100M. State of Michigan grant earmarked for site development, construction and related activities journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Capex
- $1.25 billion high-performance computing research facility source
Timeline
- Aug 2026party addedfinancier: State of Michigan
- Oct 2026Current: Announced
Sources
- U-M confirms Huron River site for $1.2 billion computing facility
- Ypsilanti Township Data Center Information
- University of Michigan selects Textile Road site for $1.2B Los Alamos supercomputing facility
- U-M Picks Ypsilanti Township For $1.25 Billion AI Supercomputing Center
1029c4e4-3281-4fed-8d55-78c6e853c664 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is University of Michigan / Los Alamos National Lab Computing Facility?
How much power will University of Michigan / Los Alamos National Lab Computing Facility use?
Who is building University of Michigan / Los Alamos National Lab Computing Facility?
Is University of Michigan / Los Alamos National Lab Computing Facility operating yet?
How verified is the data on University of Michigan / Los Alamos National Lab Computing Facility?
Deploy Watch
Track University of Michigan / Los Alamos National Lab Computing Facility on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). University of Michigan / Los Alamos National Lab Computing Facility: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/umich-lanl-ypsilanti-michigan
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/umich-lanl-ypsilanti-michigan.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/umich-lanl-ypsilanti-michigan
- Data documentation: /data
- Query this programmatically: Deploy MCP