Data center campus
University of Michigan / Los Alamos National Lab Computing Facility
University of Michigan / Los Alamos National Lab Computing Facility is an announced AI data center campus. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · greenfield · MISO · Ypsilanti Township, Michigan, United States
Capacity: announced vs energized
Announced
0.10 GW
reported
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.10 GW | 2026-08-01 | reported | journalist report |
The deal
- operator
- University of Michigan · site owner
- operator
- Los Alamos National Laboratory · DOE partner
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
Sources
- U-M confirms Huron River site for $1.2 billion computing facility
- Ypsilanti Township Data Center Information
1029c4e4-3281-4fed-8d55-78c6e853c664 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.