Stargate Saline Township (OpenAI / Oracle / Related Digital)

Stargate Saline Township is an announced AI data center campus. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · greenfield · MISO · Saline Township, Michigan, United States


Capacity: announced vs energized

Announced
1 GW
verified
Contracted
1.40 GW
reported
Under construction
not recorded
Energized
0 GW
reported

Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Stargate Saline Township (OpenAI / Oracle / Related Digital) capacity claims
Source
Announced1 GW2025-10-30verifiedpress release
Contracted1.40 GW2026-06-15reportedutility filing
Energized0 GW2026-01-20reportedjournalist report

The deal

offtaker
OpenAI · Part of OpenAI/Oracle 4.5 GW additional Stargate capacity partnership
operator
Oracle · Co-developer/operator
developer
Related Digital · Site developer
utility
DTE Energy · Supplies 100% of power (MISO); 1.4 GW / 19-year agreement

Power

Power source
grid
Grid operator
MISO
Interconnection

DTE Energy power supply agreement, 1.40 GW grid interconnect, Permitted. 19-year, 1.4 GW agreement conditionally approved by MPSC; DTE is a MISO utility, supplied 100% from existing resources plus new battery storage

Financial structure

Announced project investment (initial figure)
$7B. Officially described as multi-billion; ~$7B initial figure, reportedly more than doubled since journalist report

Sources

62a538a8-7354-4051-8f41-c9c1b866510e · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.