Data center campus
Stargate Doña Ana County / Project Jupiter (New Mexico)
Stargate Doña Ana County / Project Jupiter is an announced AI data center campus. 2.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Private land · Santa Teresa, New Mexico, United States
Capacity: announced vs energized
Announced-to-energized gap: 2.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 2.20 GW | 2026-04-17 | claimed | journalist report |
| Energized | 0 GW | 2026-07-01 | reported | journalist report |
The deal
- tenant
- OpenAI · Anchor tenant / Stargate program lead.
- developer
- STACK Infrastructure · Developer/builder of Project Jupiter (four buildings).
- developer
- Oracle · Oracle-led site under the Stargate expansion; contracts compute to OpenAI.
- chip supplier
- Nvidia · GPU supplier across the Stargate program.
Power
- Power source
- behind the meter gas
- Interconnection
Project Jupiter on-site natural gas microgrids, gas, Under construction. Two natural gas microgrids to power the campus behind the meter; individual capacity not disclosed (0.0 = unknown, not zero).
Sources
- OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites · OpenAI
- OpenAI Stargate: where the US sites stand · Epoch AI