Stargate Doña Ana County / Project Jupiter (New Mexico)

Stargate Doña Ana County / Project Jupiter is an announced AI data center campus. 2.20 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Private land · Santa Teresa, New Mexico, United States


Capacity: announced vs energized

Announced
2.20 GW
claimed
Contracted
not recorded
Under construction
not recorded
Energized
0 GW
reported

Announced-to-energized gap: 2.20 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Stargate Doña Ana County / Project Jupiter (New Mexico) capacity claims
Source
Announced2.20 GW2026-04-17claimedjournalist report
Energized0 GW2026-07-01reportedjournalist report

The deal

tenant
OpenAI · Anchor tenant / Stargate program lead.
developer
STACK Infrastructure · Developer/builder of Project Jupiter (four buildings).
developer
Oracle · Oracle-led site under the Stargate expansion; contracts compute to OpenAI.
chip supplier
Nvidia · GPU supplier across the Stargate program.

Power

Power source
behind the meter gas
Interconnection

Project Jupiter on-site natural gas microgrids, gas, Under construction. Two natural gas microgrids to power the campus behind the meter; individual capacity not disclosed (0.0 = unknown, not zero).

Sources

4c5d91e2-9598-4b3c-9128-702828bf4251 · Tracked with DEPLOY's verified-vs-claimed methodology. Announced numbers are claims, not built capacity.